20-14
Power Pack
Power Pack
20
25. A replacement BMS from Zero Motorcycles
should come programmed and ready for use.
If this is not the case, email Zero Motorcycles
Customer Service department.
•
North America:
•
Zero Motorcycles Europe:
26. After installing the BMS, it may be necessary
to reprogram the keys to the motorcycle. See
Battery Management Unit (BMU)
[22MY Onwards]
CAUTION:
Always perform the High Voltage
Discharging procedure prior to servicing any
High Voltage component or connection. Proper
procedures must be followed! To protect
electrical components, perform the following
tasks in the order given. Do not deviate from the
repair procedure processes.
NOTICE:
Before carrying out any work on the
electrical system, remove the key from the key
switch.
Removal
1. Remove service cover. See
2. Carefully pull BMU to release from grommets
(x2).
3. Disconnect harness connectors (x2).
4. Remove BMU.
Содержание SR/S
Страница 2: ......
Страница 10: ...2 4 General Information ...
Страница 68: ......
Страница 90: ......
Страница 177: ...Suspension Rear Suspension 40 41 40 12 Recheck the belt adjustment after the test ride and readjust if necessary ...
Страница 178: ......
Страница 210: ......
Страница 243: ...Body Body 60 33 60 9 Remove right grab handle Installation 1 Installation is the reverse of the removal procedure ...
Страница 273: ...Electrical Mode Switch 70 25 70 Installation 1 Installation is the reverse of the removal procedure ...
Страница 289: ...Electrical Main Bike Board MBB 70 41 70 ...
Страница 290: ......