background image

20  •  Maintenance

MAINTENANCE

Cleaning

Although each Zero Zone display case is thoroughly cleaned before shipping, the cases should be thoroughly cleaned again before start-up and 

routinely thereafter to maintain a clean appearance. With just a few minutes of cleaning each week, the case will remain in top condition.

1.  Do not use high-pressure water or steam to clean the interior or any components.
2.  Do not wash fan motors. A damp cloth can be used to wipe the fan motors. Cover the fan motors with a plastic bag when washing the case.
3.  Wipe out the case interior using mild detergent and warm water (never an abrasive cleaner).
4.  Clean windowed ends and mirrors using glass cleaner. Cleaning interior glass reduces fogging and increases visibility.  

Do not use any cleaning products containing silicon for anti-fog.

5.  Internal components can be cleaned after removing coil covers, access panels, and sheet metal components. use a mild detergent and 

warm water or a mild sanitizer.

6.  If the case is equipped with a condensate pan and pump, the drain should be blocked before washing coils. Water can be removed with a 

shop vacuum.

7.  Coils may be cleaned with a garden hose or pails of water. If the case is equipped with a condensate pan and pump, cases should be 

cleaned with a minimal amount of water so the evaporator, pump, and drain pans do not get overfilled.

8.  The case drain should frequently be cleaned of debris to prevent clogging. If water is rising, check if the drain is clogged.

UNDER CASE FLOOR CLEANING (NSF)

The floor under your Zero Zone display case can be cleaned by following these steps:

1.  Remove the fasteners attaching the kickplate to the case. The fasteners are accessed from the front of the unit.
2.  With the kickplates removed, vacuum under the case to remove any dirt, debris, and dust build-up.
3. 

Mop under the unit using non-abrasive floor cleaner and warm water.

4. 

When finished mopping, squeegee any remaining water under the unit to the floor drains to speed up the drying process. Replace the 

kickplates when the floor has dried.

Содержание Reveal Merchandiser ORMC75-MX

Страница 1: ...ZERO ZONE REVEAL MERCHANDISER OPEN MULTI DECKS With ChillBrite LED Lighting INSTALLATION OPERATION MANUAL COMPLIANT 66 0057 REV E Aug 2021...

Страница 2: ...Night Curtains 14 Under Shelf Lights 14 Canopy Lights 15 Shelves Stocking Product 15 REFRIGERATION 16 Mechanical Components 16 Evaporator Coil Expansion Valve 16 Evaporator Fans 16 Refrigerant Piping...

Страница 3: ...all not be covered by this warranty Extended Warranties In addition to the standard limited warranty for further consideration the Seller will extend to the original purchaser prior to shipment a limi...

Страница 4: ...questions or problems arise call Zero Zone at 800 247 4496 Any change to a Zero Zone product made during the installation start up or at any other time must be submitted in writing to Zero Zone for ap...

Страница 5: ...Refrigerators and Freezers ANSI Approved equipment certified by NSF NSF 51 Food Equipment Materials ANSI Approved equipment certified by NSF UL 471 Commercial Refrigerators and Freezers ANSI Approved...

Страница 6: ...the right end and the second case in the lineup will be labeled on the left end The numbers on each end to be joined will match See Figure 1 The first case in a lineup with the right side labeled x 1...

Страница 7: ...instructions CASE MODEL INSTRUCTIONS 4ORMC Forks must extend 20 to 24 under the case from either end 6ORMC Forks must extend 26 to 30 under the case from either end 8ORMC Forks must extend 39 to 43 u...

Страница 8: ...not extend beyond the front case bases or they will interfere with installing trim The shims should be oriented to sit under the front and rear bends of each base Tape all shims in place See Figure 7...

Страница 9: ...peration 7 Installation Operation Figure 8 Reveal Merchandiser Base Locations 4ORMC 6ORMC 8ORMC 12ORMC Drawings are top views with bases shown under the case Case length does not include end panels 1...

Страница 10: ...e setting the next case in the lineup Case caulking instructions and caulk are shipped with every case See Figure 10 on page 9 Move the next case into position and bolt it to the first case using the...

Страница 11: ...e to ensure a tight seal 3 Repeat this process between each case in the lineup SURFACES TO BE CAULKED MUST BE CLEAN DRY AND FREE OF FROST ABOVE 40 F Note NSF sealant must be applied with no gaps to se...

Страница 12: ...eed to loosen the canopy screws if canopies are not within 3 8 On cases with stainless steel canopies the splice is shipped loose Fit it over both canopies and screw into place Hand Rail Splice Some c...

Страница 13: ...s of drain pipe should be installed through the bases See Figure 17 There is no room in front of the base for the drain pipe because the kickplate installs directly to the front of the bases Install t...

Страница 14: ...If a continuous bumper is used only the bumper support and snap track will be installed The continuous bumper may need to be trimmed before snapping it onto the snap track Figure 18 Kickplate Installa...

Страница 15: ...Install Mirror Support into the Shelf Standards Install into second and third slots from the top Figure 21 Shelf Standard Slots for Air Deflector MIRROR HEIGHT SLOT FOR AIR DEFLECTOR 8 Tall 6th Slot...

Страница 16: ...st it until you hear a click as the brackets engage See Figure 24 Once installed the night curtain can be pulled down See Figure 25 Under Shelf Lights 1 Position the under shelf light on the bottom of...

Страница 17: ...rack Note Do not place product on the return air grille or past the load limit line Do not exceed shelf load capacity See Figure 28 Do not stand on the case when stocking or adjusting shelves SHELF T...

Страница 18: ...hould be replaced with OEM parts or have the same fan pitch as the OEM fan blade CAUTION DISCONNECT POWER TO THE CASE BEFORE SERVICING ELECTRICAL COMPONENTS TO AVOID PERSONAL INJURY AND DAMAGE TO THE...

Страница 19: ...valent feet 90 F Liquid 2 F Pressure Drop Up to 150 equivalent feet 90 F Liquid 2 F Pressure Drop Up to 150 equivalent feet 90 F Liquid 2 F Pressure Drop It may be necessary to make adjustments to com...

Страница 20: ...rost may cause premature defrost termination Case Thermometer The cases are shipped with two thermometers One thermometer is factory mounted in the center ceiling pocket cover to sense the discharge a...

Страница 21: ...case wiring See Figure 37 Terminal blocks are provided for supplying power for fans and lights A ground connection can also be made inside the electrical enclosure Optional top electrical will be loca...

Страница 22: ...a mild detergent and warm water or a mild sanitizer 6 If the case is equipped with a condensate pan and pump the drain should be blocked before washing coils Water can be removed with a shop vacuum 7...

Страница 23: ...cal Resources page at WWW ZERO ZONE COM or contact the Zero Zone Service Department at 800 247 4496 All specifications subject to change without notice 66 0057 REV E ZERO ZONE INC 800 247 4496 ZERO ZO...

Отзывы: