62
Main fuse Type 1
5.2
Before starting work
Main fuse Type 2
Main power switch
Service and maintenance
IMPORTANT
!
Carry out the following before starting any service or maintenance:
•
Lower and tilt the platform down so that it rests on the ground to reduce pressure in the
hydraulic system to a minimum.
•
Cut the power supply by disconnecting the cable at the main fuse or by switching off the
main power supply with the main switch, where fitted. Main fuses and main switches come
in several different designs; below are some typical examples.