ZEPIRO D2O RG1 Скачать руководство пользователя страница 2

Installation

SITE SELECTION

1.

D2O

90°

60°

30°

60°

30°

S

a

t

el

l

it

e

 P

a

sse

s

2m+

1-2m+

Antenna

Antenna

Base

Tighten Grub 

Screw

2mm

INSTALL THE D2O ANTENNA

2.

Screw the Antenna to the Antenna Base and secure by 

fastening the Grub Screw.

*NPS DN 25mm / 1”

AS/NZS1163  |  ASTM 153M

>26mm

INTERNAL DIA.

30mm to 34.5mm

OUTSIDE DIA.

PREPARE MOUNTING POST

3.

1.

2.

3.

2.5mm

Tighten

Grub Screw

MOUNT THE D2O

4.

Connect and secure the Interface Cable, place the D2O 

onto the Mounting Post and secure using the Grub Screw 

to prevent rotation or easy removal - do not over-tighten.

CONNECT INTERFACE CABLE

5.

Connect the Interface Cable to the pulse type tipping 

bucket rain gauge.  Terminate PIN 6 with PIN 3 at the 

rain gauge device’s GND terminal.

D2O Already Programmed

& Commissioned? 

TO 

COMPUTER

sys -p ON

Enable Power 

in Serial Terminal

using command:

INSTALLATION COMPLETE

6.

If already commissioned - Power on the D2O Unit before 

leaving.  Ensure installation is secure.  

Optional - Grub 

Screw heads can be epoxy filled for tamper evidence.

Ensure a clear view of the sky in all directions.  Place 

above ground (1-2m), away from obstructing objects and 

>2m from strong magnetics or sources of electrical noise.

Prepare and install an appropriately sized metal 

Mounting Post solution and break sharp edges.  Feed 

through the Interface Cable. 

*Recommended Pipe

 (Fence Post)

.

P1

White Not Used

P2

Brown Not Used

P3

Green Signal GND

P4

Yellow Not Used

P5

Purple Not Used

P6

Pink

Wire Fault 

- Terminate with PIN 3

P7

Blue

Pulse Input

P8

Red

Not Used

Отзывы: