background image

Installation – 

Mounting Height & Clearance

6

www.zephyronline.com

DUCTING

A minimum of 8” round duct is recommended to 
maintain maximum air fl ow effi ciency.

Always use rigid type metal ducts only. Flexible 
ducts could restrict air fl ow by up to 50%.

Use calculation worksheet to compute total duct 
work (Page 5).

ALWAYS, when possible, reduce the number of 
transitions and turns. If a long duct run is required, 
increase duct size from 8” to 10”.

If turns or transitions are required: Install as far 
away from duct opening and as far apart between 
the two transitions as possible.

Minimum mount height between range top to hood 
bottom should be no less than 26”.

Maximum mount height should be no higher than 
34”.

It is important to install the hood at the proper 
mounting height. Hoods mounted too low could 
result in heat damage and fi re hazard; while hoods 
mounted too high will be hard to reach and will 
loose its performance and effi ciency.

If available, also refer to range manufacturer’s 
height clearance requirements and recommended 
hood mounting height above range. Always check 
your local codes for any differences.

Duct cover extension kit available for ceiling heights 
up to 12 feet. Turn to page 21 for part number and 
ordering information.

DAMAGE-SHIPMENT / INSTALLATION:
•  Please fully inspect unit for damage before 

installation.

•  If the unit is damaged in shipment, return the 

unit to the store in which it was bought for 
repair or replacement.

•  If the unit is damaged by the customer, repair 

or replacement is the responsibility of the 
customer.

•  If the unit is damaged by the installer (if other 

than the customer), repair of replacement must 
be made by arrangement between customer 
and installer.

min.  A
min.  B
max. C

    

 

 

 

Standard  

     Extension

Hood Heights  

 

Duct Cover 

     Duct Cove

r

            minimum ducted (A)  28” 

 

     41 

1/2

 minimum recirculating (B)  32” 

 

     45 

1/2

                          maximum (C)  50” 

 

     80”

Ceiling Heights

           minimum ducted (D)  90” (7’ 6”)               103 

1/2

“ (8‘ 7 

1/2

”)

 minimum recirculating (E)  94” (7’10”)             107 

1/2

“ (8’11 

1/2

”)

                          maximum (F)  120” (10’)              150” (12’ 6”)

36”

26” min.

34” max.

min.  D
min.  E
max. F

Содержание ZMD-E42AS

Страница 1: ...Use Care and Installation Guide Model number Serial Number JUL12 0501 Zephyr Corporation Air ow Control Technology TM C Modena Island ZMD M90AS ZMD E42AS www zephyronline com...

Страница 2: ...www zephyronline com...

Страница 3: ...ance 6 Ducting Options 7 Hood Speci cations 8 Mounting the Hood 9 12 Ductless Recirculating 13 FEATURES CONTROLS Touch Controls 14 User Interface 15 MAINTENANCE Hood and Filter Cleaning 16 TROUBLESHOO...

Страница 4: ...PERSONS IN THE EVENT OF A RANGE TOP FIRE OBSERVE THE FOLLOWING a SMOTHER FLAMES with a close tting lid cookie sheet or metal tray then turn off the burner BE CAREFUL TO PREVENT BURNS If the ames do n...

Страница 5: ...st edition or CSA standards C22 1 94 Canadian Electrical Code Part 1 and C22 2 No 0 M91 latest edition and all local codes and ordinances If codes permit and a separate ground wire is used it is recom...

Страница 6: ...per pre installed MODELS ZMD M90AS ZMD E42AS PARTS SUPPLIED HARDWARE PACKAGE CONTENTS PARTS NOT SUPPLIED Ducting conduit and all installation tools Cable connector if required by local codes Duct cove...

Страница 7: ...ct pieces T otal Equivalent number length x used 6 8 Round wall cap with damper 30 Ft x Ft Round wall cap with damper 30 Ft x Ft 7 or 8 Round 900 elbow 15 Ft x Ft 7 or 8 7 or 8 Round 450 elbow 9 Ft x...

Страница 8: ...formance and ef ciency If available also refer to range manufacturer s height clearance requirements and recommended hood mounting height above range Always check your local codes for any differences...

Страница 9: ...s using the recirculating option Use single wall rigid Metal ductwork only Fasten all connections with sheet metal screws and tape all joints w certi ed Silver Tape or Duct Tape Some Ducting Options I...

Страница 10: ...TOP SUPPORT FRAME top view C L 11 3 16 11 3 8 5 1 4 1 2 11 5 8 5 7 8 STANDARD min ducted 28 min recirc 32 max 50 Z1C 00MD min ducted 41 1 2 min recirc 45 1 2 max 80 14 3 16 27 1 2 1 3 16 13 11 16 35...

Страница 11: ...mpletely tighten screws leave approx 1 4 exposed 2 Hood Preparation Remove screws securing top and bottom support frames together Adjust support frame to accomodate the desired hood height and re asse...

Страница 12: ...with washers into the two remaining corners of the top support frame to secure it to the ceiling Tighten all screws FIG D FIG E 3 Hood heights between 40 to 50 require lateral support brackets to be...

Страница 13: ...on the bottom of the support frame FIG H Slide hood towards the narrow end of key holes to lock in place Hand tighten each of the 4 screws to secure hood to bottom of support frame Install 1 M4 x 12mm...

Страница 14: ...rlap the smaller holes 13 Assemble bottom duct covers together over top duct covers using 3 M3 x 5 screws on each side Bottom duct covers will rest on top of the hood body FIG J 3 14 Insert the 2 thin...

Страница 15: ...CTING IS USED Kit includes charcoal lter charcoal lter bracket and air diverter plate Hood Model Part No Filters in Pkg ZMD M90AS ZRC 00MD 1 ZMD E42AS ZRC 00MD 1 1 Purchase recirculating kit per the p...

Страница 16: ...imum blower CFM to align with local codes and regulations To verify the maximum blower CFM With hood off hold the Button for three seconds The blower CFM will be displayed on the LCD 2 Speed Selection...

Страница 17: ...time to replace the charcoal filter Graphic and words will remain illuminated until reset To reset With hood off hold the Button for three seconds after three seconds the Graphic and words replace cha...

Страница 18: ...m Mesh Filters The aluminum mesh lters installed by the factory are intended to lter out residue and grease from cooking They need not be replaced on a regular basis but are required to be kept clean...

Страница 19: ...not in the correct position 1 Adjust the lters until the whistling stops 2 The duct pipe connections are not sealed or connected properly 2 Check the duct pipe connections to be sure all connections a...

Страница 20: ...set the maximum blower speed to one of three most commonly speci ed CFM levels 590 440 or 290 CFM The usage of ACT may not be necessary for your installation Please check your local codes for CFM rest...

Страница 21: ...19 Fan Curve Diagrams...

Страница 22: ...3Wx4 Total Max 215W 3 5A Voltage 120V 60Hz Model ZMD M90 E42AS Power consumption U U V W V W AC N AC L ON OFF DOWN UP LAMP 5A 250V Power consumption shown for default 715 CFM blower con guration ACT...

Страница 23: ...lb LED 3W Z0B 0032 Aluminum Mesh Filter 50200042 Optional Accessories Recirculating Kit ZRC 00MD Replacement Charcoal Filter Z0F C002 Duct Cover Extension up to 12 ceiling Z1C 00MD To order parts visi...

Страница 24: ...all labor costs associated with this warranty Limitations of Warranty OUR OBLIGATION TO REPAIR OR REPLACE AT OUR OPTION SHALL BE YOUR SOLE AND EXCLUSIVE REMEDY UNDER THIS WARRANTY WE SHALL NOT BE LIAB...

Страница 25: ...on d entretien et d installation Num ro de mod le _________________ Num ro de s rie _________________ JUL12 0501 Zephyr Corporation Air ow Control Technology TM C Modena Island ZMD M90AS ZMD E42AS www...

Страница 26: ...www zephyronline com...

Страница 27: ...llation pour le conduit 7 Sp ci cations de la hotte 8 Montage de la hotte 9 12 Reprise d air sans conduit 13 COMMANDES Commandes ef eurement 14 Interface utilisateur 15 ENTRETIEN Nettoyage des ltres e...

Страница 28: ...es ustensiles convenant au type et la quantit de nourriture que vous pr parez AVERTISSEMENT POUR R DUIRE LES RISQUES DE BLESSURE LORS D UN INCENDIE SUR LA SURFACE DE CUISSON a TOUFFEZ LES FLAMMES avec...

Страница 29: ...ode national de l lectricit la plus r cente dition du ANSI NFPA 70 ou des normes du CSA C22 1 94 le Code canadien de l lectricit section 1 la plus r cente dition du code C22 2 No 0 M91 ainsi que tous...

Страница 30: ...onduit 1 Bo tier de la hotte avec ventilateur pr install 1 Filtres tamis en aluminium 4 Ampoules DEL 3W 1 Registre circulaire de 8 pr install MOD LES ZMD M90AS ZMD E42AS PI CES FOURNIES CONTENU DE LA...

Страница 31: ...gth x used 6 8 Round wall cap with damper 30 Ft x Ft Round wall cap with damper 30 Ft x Ft 7 or 8 Round 900 elbow 15 Ft x Ft 7 or 8 7 or 8 Round 450 elbow 9 Ft x Ft Ft Ft Ft 6 8 Round roof cap 30 Ft x...

Страница 32: ...sultez les exigences de hauteur d espace libre requise par le fabricant de la cuisini re ainsi que la hauteur recommand e de montage de la hotte au dessus de la surface de cuisson Informez vous toujou...

Страница 33: ...utilis e N utilisez que des conduits en m tal pour cloison simple Fixez toutes les pi ces du conduit avec des vis t le et isolez tous les joints avec du ruban adh sif en toile ou du ruban r ecteur ce...

Страница 34: ...ADRE DE FIXATION SUP RIEUR vue du dessus L C 11 3 16 11 3 8 5 1 4 1 2 11 5 8 5 7 8 STANDARD Min avec conduit 28 Min avec reprise d air 32 max 50 Z1C 00MD Min avec conduit 41 1 2 14 3 16 27 1 2 1 3 16...

Страница 35: ...r environ 1 4 2 Pr paration de la hotte Enlevez les vis qui retiennent les cadres de xation sup rieur et inf rieur ensemble Ajustez le cadre de xation selon la hauteur d installation d sir e de la hot...

Страница 36: ...x coins restants du cadre de xation sup rieur pour le xer solidement au plafond Serrez les vis 3 Des pattes de support lat rales doivent tre x es aux deux bras du cadre de xation sup rieur et aux bras...

Страница 37: ...rieur FIG H Faites le glisser vers la partie troite des encoches en trou de serrure pour le xer en place Serrez chaque vis la main pour xer la hotte au cadre de xation inf rieur Fixez une vis de s re...

Страница 38: ...us 13 Assemblez les pi ces de recouvrements inf rieures l aide de trois vis M3 x 6 par c t Les pi ces de recouvrements inf rieures reposeront sur la partie sup rieure du bo tier de la hotte FIG J 3 14...

Страница 39: ...charbon et un d ecteur d air Mod le de hotte Num ro de pi ce Filtres par paquet ZMD M90AS ZRC 00MD 1 ZMD E42AS ZRC 00MD 1 1 Procurez vous l ensemble de reprise d air en utilisant le num ro de pi ce ci...

Страница 40: ...isateur de contr ler le maximum CFM de la ventilateur Pour v rifier le CFM du vos ventilateur Avec la hotte d sactiv maintenez le bouton pendant trois secondes Le CFM de la ventilateur sera affich sur...

Страница 41: ...nitialisation de la fonction Pour r initialiser Lorsque la hotte est teinte appuyez et tenez la touche enfonc e pendant trois secondes Apr s trois secondes le symbole et les mots replace charcoal filt...

Страница 42: ...install s par le fabricant ont pour fonction de ltrer les r sidus et la graisse de cuisson Ils ne n cessitent aucun remplacement sur une base r guli re mais doivent tre gard s propres Apr s 30 heures...

Страница 43: ...ez l installation de la hotte 4 Tableau de contr le commande d fectueux 4 Remplacez la pi ce d fectueuse Les niveaux de vitesse de la souf erie le m me son 1 Utilisation de la mauvaise taille de canal...

Страница 44: ...teur l un des trois les plus couramment prescrits niveaux de CFM 590 440 ou 290 CFM L utilisation de l ACT peut tre pas n cessaire pour votre installation S il vous pla t v ri ez vos codes locaux pour...

Страница 45: ...19 Tableau De Rendement Du Ventilateur...

Страница 46: ...gie Lampe Ventilateur PROT G THERMIQUEMENT SCH MA DE CIRCUITS BO TIER MOTEUR CC BLANC NOIR VERT LAMPE BRANCHEMENT DES COMMANDES DEL DEL DEL DEL CCI DES COMMANDES HAUT BAS DEL Consommation montr pour d...

Страница 47: ...50200042 Accessoires optionnels Ensemble de reprise d air ZRC 00MD Filtre charbon de remplacement Z0F C002 Ensemble de prolongement de recouvrement de conduit Z1C 00MD Pour des plafonds allant jusqu 1...

Страница 48: ...ain d uvre associ s la pr sente garantie Restrictions de la garantie NOTRE OBLIGATION DE R PARER OU DE REMPLACER NOTRE GR LE PRODUIT CONSTITUE VOTRE SEUL ET UNIQUE RECOURS SOUS LA PR SENTE GARANTIE NO...

Отзывы: