13
Installation –
Mounting the Hood
1
Top Duct Covers
Top Support Frame
Bottom Duct Covers
Bottom Support Frame
6. Remove tape securing electronics mounting bracket to hood and reposition electronics mounting bracket.
(FIG. E) Install electrical and duct work. A cable lock, not supplied, might be required by local codes. (FIG.
E) Seal duct work with aluminum duct tape.
7. Power up hood, verify all functions and check for leaks around duct tape.
8. Assemble Top Duct Covers (with louver holes) together over Top Support Frame, secure Top Duct Covers
together by magnetic strips.
Note:
If using hood in ductless recirculating mode you must install the air
diverter plate to the Top Support Frame prior to assembling the duct covers. Turn to page 11 for more
details.
9. Secure Top Duct Covers to Top Support Frame by using (4) 3/16 x 1/4 screws (2 screws for each Top Duct
Cover). (FIG. D1).
10. Assemble Bottom Duct Covers together over Top Duct Covers and secure together by magnetic strips.
Bottom Duct Covers should rest on top of the Hood Body.
FIG. D
Cable Lock
Cable Lock
A cable locking connector (not
supplied) might be required
by local codes. Check with
local requirements and codes,
purchase and install appropriate
connector if necessary.
FIG. E
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
!
FIG. F
Содержание ZAZ Series
Страница 2: ...www zephyronline com...
Страница 23: ...21 Fan Curve Diagrams...
Страница 24: ...22 www zephyronline com Fan Curve Diagrams...
Страница 30: ...www zephyronline com...
Страница 51: ...21 Tableau De Rendement Du Ventilateur...
Страница 52: ...22 www zephyronline com Tableau De Rendement Du Ventilateur...