18
Tempest II Use, Care, and Installation Guide
T E M P E S T I I
U N D E R - C A B I N E T
P R O
Installation Instructions
Mounting the Hood
7. Prepare electrical wiring and electrical cut outs in upper cabinet if needed or wall if horizontal
electrical hook up is required. Refer to hood specifications on page 15 for dimensions.
8. Mount hood onto wood board and secure using (4) #6 wood screws.
9. Further secure hood onto wall through lower body screw holes by (2) #6 wood screws. See
dimensions in FIG. C.
10. Install electrical.
11. Install duct work and seal with certified aluminum duct tape.
12. Power up hood and check for leaks around duct tape.
13. Install baffle filters.
FIG. C
16-7/8”
16-1/8”
13-5/8”
1-11/16”
3-5/16”
21-1/4”
27-3/8” (36“ & 42”), 35-1/4” (48” & 54”)
5-5/16”
Содержание Tempest II AK7500CS
Страница 2: ...2 Tempest II Use Care and Installation Guide TEMPEST II UNDER CABINET PRO...
Страница 41: ...41 Tempest II Use Care and Installation Guide ZEPHYRONLINE COM Notes...
Страница 42: ...42 Tempest II Use Care and Installation Guide TEMPEST II UNDER CABINET PRO Notes...
Страница 46: ...2 Tempest II Guide d utilisation d entretien et d installation TEMPEST II SOUS ARMOIRE PRO...
Страница 85: ...41 Tempest II Guide d utilisation d entretien et d installation ZEPHYRONLINE COM Remarques...
Страница 86: ...42 Tempest II Guide d utilisation d entretien et d installation TEMPEST II SOUS ARMOIRE PRO Remarques...