Place the Pop-up marquee on level ground
Always secure the Pop-up marquee to the ground
using either pegs / stakes or weight bags.
Do not use the Pop-up Marquee in windy weather
Let the marquee dry fully before storing away
Only use mild detergent and water to clean the graphics.
11, Velcro the top of back panel onto the bottom edge of the canope valance, starting from one
corner. (Fig 13) Ensure that it is high enough so that the velcro is not visible from the outside.
12, To add a side, starting from the top, zip the side panel to the back panel ensuring that you
have the correct side facing out. ( Fig 14)
13, Once zipped up, velcro the top of the side to the bottom of the valance on the canopy, again
making sure that the velcro isn’t visable from the outside. Repeat the process until all the
panels required are fixed into position. (Fig 15)
14, Where you have no further panels, use the velro strips to secure the edge of the panel to the
leg of the frame. (Fig 16)
15, Unzip and pull the panels off the velcro on the canopy valance. Press the red lever on leg joints
to release the legs and push them back into themselves. (Fig 17)
16, Press the red release lever in the top corners of the frame to release the sliding black
connectors allowing the frame to collapse. (Fig 18)
17, Grab two diagonally opposite legs and walk inwards collapsing the frame down as you move
inwards towards the centre. (Fig 19)
18, Remove the roof canope from the frame. (Fig 20). Close the frame completely and put the
frame back in it’s case.
FITTING THE PANELS
TAKING DOWN THE MARQUEE
Fig 13
Fig 14
Fig 16
Fig 15
Fig 13
Fig 14
Fig 16
Fig 15
Fig 17
Fig 18
Fig 19
Fig 20
Fig 17
Fig 18
Fig 19
Fig 20
Marquee size
Marquee height
Frame diameter
Panel size (half wall)
(full wall)
Frame weight
Canope weight
Panel weight (half wall)
(full wall)
Bag Weight
3m x 3m
285cm
40mm
3m x 1.08m
3m x 2m
18.2kg
3.4kg
0.7kg
1.5kg
3kg
September 2016 v1
3m x 3m