12
www.zephyronline.com
gap between
bracket and
wall
Top
Bottom
0HDVXUHIURPFRRNLQJVXUIDFHWRGHVLUHGKRRGERWWRPOHYHODQGPDUNOLQH$´PLQXPXPIURPFRRNLQJ
VXUIDFH
2. Plum and mark center line.
0DUNOLQH%´XSIURPOLQH$7KLVLVWKHWRSSRVLWLRQRIWKHZDOOEUDFNHW),*
)ROORZFHQWHUOLQHXSWRWKHFHLOLQJPHDVXUHDQGPDUNFHLOLQJEUDFNHWPRXQWOLQH&´RXWIURPWKHZDOO
onto the ceiling. FIG. 2
0DUNFHLOLQJEUDFNHWPRXQWLQJVSUHDG´IURPFHQWHUOLQHRQOLQH&),*
6. Place duct cover ceiling bracket onto ceiling and mark inside diameter of ceiling bracket. Cut inside
GLDPHWHURIFHLOLQJEUDFNHWWR¿WWKH´RU´URXQGGXFWSLSH
7. Prepair duct work and electrical through ceiling.
$WWDFKFHLOLQJEUDFNHWWRFHLOLQJE\0´VFUHZV:RRGEORFNLQJPD\QHHGWREHDGGHGLQVLGH
ceiling to support the weight of the upper duct cover.
9. Place and center the top of wall bracket on line B. The top of the wall bracket will have a gap between the
bracket and the wall. FIG. 3
A
min. 26”
max. 36”
C/L
14-1/2”
9-11/16”
B
C/L
Installation –
Mounting the Range Hood
CAUTION: At least two installers are
required due to the weight and size of the
hood.
!
6”
C/L
8-11/16”
C
FIG. 1
FIG. 3
FIG. 2
Содержание Okeanito COK-E36BSX
Страница 2: ...www zephyronline com...
Страница 20: ...18 www zephyronline com Wiring Diagrams...
Страница 21: ...19 Wiring Diagrams...
Страница 26: ...www zephyronline com...