Installation –
Installing the Hood
12
www.zephyronline.com
A
10) Place 6” round ducting over blower collar and secure
with aluminum duct tape. If using hood in ductless
recirculating mode turn to page 13.
Install electrical wiring. Note: A cable lock (not
included) may be required by local codes. Check
with local requirements and codes, purchase and install
appropriate connector if necessary.
Make sure no packing material is inside hood. Power
up hood check for leaks around duct tape and verify all
functions.
Fig.11
Fig.12A
11) Secure (2) 1” wood screws (A) into the screw holes on
the left and right sides of the fi lter opening. This will secure
the hood body to the cabinet base and prevent the hood
from shifting after installation.
Fig.12B
12) Place front panel back on hood body and secure in
place by using the (10) screws previously removed from
step 2.
Содержание Genova ZGE-E36AS290
Страница 2: ...www zephyronline com...
Страница 21: ...19 Maintenance Wiring Diagram 370W 270W...
Страница 26: ...www zephyronline com...
Страница 30: ...Liste du mat riel 4 www zephyronline com 2 M4 x 1...
Страница 34: ...8 www zephyronline com Installation Sp ci cations de la hotte LC...
Страница 40: ...14 www zephyronline com Commandes Commandes ef eurement...
Страница 41: ...15 Commandes Indicateur de changement des ltres charbon...
Страница 42: ...16 www zephyronline com COMMANDES Indicateur de nettoyage des ltres tamis m talliques...
Страница 46: ...20 www zephyronline com Entretien Sch ma de c blage...