19
Monsoon II Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
Preparation & Installation
Locking Tabs
Bottom Panel Screws
2
1
4. Remove bottom panel by: 1)
Removing (2) screws from left and
right sides of bottom panel. 2)
Pulling bottom panel toward front
of liner to release from locking
tabs.
6. Vertical ducting preparation is
complete. Refer to page 18, step
4 to complete installation.
5. Secure 10” round ducting collar
to top of insert by (4) M4 x 6mm
screws.
Содержание AK9334BS
Страница 2: ...2 Monsoon II Use Care and Installation Guide MONSOON II INSERT PRO...
Страница 34: ...34 Monsoon II Use Care and Installation Guide MONSOON II INSERT PRO Notes...
Страница 38: ...2 Monsoon II Guide d utilisation d entretien et d installation MONSOON II INS RER PRO...
Страница 70: ...34 Monsoon II Guide d utilisation d entretien et d installation MONSOON II INS RER PRO Remarques...