20
Monsoon I Use, Care, and Installation Guide
M O N S O O N I
I N S E R T
C O R E
Installation Instructions
Vertical Ducting Preparation
Locking Tabs
Bottom Panel Screws
2
1
4. Remove bottom panel by: 1)
Removing (2) screws from left and
right sides of bottom panel. 2)
Pulling bottom panel toward front
of liner to release from locking
tabs.
6. Vertical ducting preparation is
complete. Refer to page 18, step
4 to complete installation.
5. Secure 8” round adapter or 10”
round adapter to top of liner by
(4) M4 x 6mm screws.
Содержание AK9228BS
Страница 2: ...2 Monsoon I Use Care and Installation Guide MONSOON I INSERT CORE...
Страница 42: ...42 Monsoon I Use Care and Installation Guide MONSOON I INSERT CORE Notes...
Страница 46: ...2 Monsoon I Guide d utilisation d entretien et d installation MONSOON I INS RER CORE...
Страница 86: ...42 Monsoon I Guide d utilisation d entretien et d installation MONSOON I INS RER CORE Remarques...