1. Remove filters
2. Remove cover from junction box to
gain access to electrical wiring.
3. If using a cable lock, pry open the
desired electrical knockout either on
top or back of hood. Feed the wires
through the cable lock. Some local
codes require the use of a cable lock,
check your local codes.
4. If using hood in air recirculating
mode skip steps 4 and 5.
Pry open desired 3-1/4” x 10” ducting
knock-out either on top or back of
hood.
5. Secure 3-1/4” x 10” starting collar
with damper to the duct opening using
(10) M4x8 screws.
Installation –
Preparing Electrical and Ducting
10
www.zephyronline.com
Содержание AK1100 Series
Страница 2: ...www zephyronline com...
Страница 20: ...18 www zephyronline com Wiring Diagrams RED BLACK...
Страница 24: ...www zephyronline com...
Страница 42: ...18 www zephyronline com SCHEMA DE CABLAGE RED BLACK...