© 2013/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0329-001 Rev F
File Generated July 3, 2013
Page 46
ZS SPAN INSTALLATION MANUAL FOR RAIL-BASED APPLICATIONS - U.S.
Special Inset: Grip Installation
The Grip
fits beneath the Array Skirt,
securing the Array Skirt to the first col-
umn of Cam Feet.
i
Notch clips onto
Array Skirt
Indented notch fits
over Cam Foot
threaded stud
Slide the Grip into position around the
Rockit and threaded stud of the Cam
Foot. Be sure to hook the top notch into
the corresponding notch on the Rockit as
shown.
Top notch slides
onto Rockit
ii
Part No. 850-1421
Slide in from the right
Slide in from the left
Part No. 850-1413
Part No. 850-1284
Use a screwdriver to
push the Grip into
position