SE4
■
MOUNTING ENGINE (SE1)
1. Push the driveshaft housing toward the clutch
housing and rotate it by hand to check that the
driveshaft is engaged with the gears.
2. Insert the driveshaft housing into the clutch
housing until it bottoms, and align the positioning
holes on the clutch housing and the shaft tube
and install the screw. When difficult to engage,
twist the engine slightly.
3. Fasten the clamp securely with two screws.
Tighten the screws(1) gradually by turns.
Tightning Torque: 44~70in-lbs (5~8N.m.)
■
CONNECTING THROTTLE WIRE
1. Remove the air cleaner cover.
2. Connect the end of the throttle wire to the joint
on the top of the carburetor. (SE2)
■
CONNECTING SWITCH WIRES
• Connect the switch wires between the engine
and the main unit. Pair the wires of the same
color.
■
MOUNTING OTHER PARTS
1. Insert the driveshaft into the clutch drum, then
attach the gearbox to the shaft tube as aligning
the positioning holes and fasten the screw(A).
Fasten the clamp bolt(B) firmly. (SE3)
(A)Screw
(B)Clamp bolt
(B) Tightning Torque: 52~69in-lbs(6~8N.m.)
2. Install the handle to the shaft tube and clamp at
a position best for your job. (SE4)
IMPORTANT
6. Set up
SE1
[HE225F]
[HEZ2500F]
SE2
(A)
(B)
SE3
13
Содержание HEZ2500F
Страница 2: ......
Страница 26: ...12 Parts list 26 Fig 1 DRIVE UNIT S N 200001 and up...
Страница 28: ...12 Parts list 28 Fig 2 ENGINE UNIT HE225F S N 50100000 and up...
Страница 30: ...Fig 3 ENGINE UNIT HEZ2500F S N 50100000 and up 30 12 Parts list...
Страница 34: ......
Страница 35: ......
Страница 36: ...KOMATSU ZENOAH AMERICA INC 4344 Shackleford Road Suite 500 Norcross Georgia 30093 Printed in Japan...