ASSEMBLY OF FRAME 

 1  

Please  remove  the  additional  module  from  the  enclosure 

and place the metallic auxiliary parts supplied with the frame. 

 

 2  

Place the enclosure inside the flush-mount box and recover 

the cables. Fix the module with the screws (included). 

 

 3  

Connect the additional module to the bus. 

 

 4  

Fix the additional module with the supplied screws. 

 

 5  

Place the frame. 

 

 6  

Fix the frame by using the supplied Allen key. 

 

 

Dimensions: 151 x 129 x 5.5 mm 

Содержание GetFace IP ZVPFFRA1B

Страница 1: ...1 ASSEMBLY OF FRAME 1 Please remove the additional module from the enclosure and place the metallic auxiliary parts supplied with the frame 2 Place the enclosure inside the flush mount box and recover the cables Fix the module with the screws included 3 Connect the additional module to the bus 4 Fix the additional module with the supplied screws 5 Place the frame 6 Fix the frame by using the suppl...

Страница 2: ...he basic unit inside the flush mount box and recover the cables Fix the enclosure with the screws included 3 Connect the cables to the basic unit and interconnect the additional modules with the bus 4 Fix the blind panel or additional modules that remain in sight with the supplied screws and put the labels with captions next to the buttons 5 Place the frame 6 Fix the frame by using the supplied Al...

Страница 3: ...inside the flush mount box pass previously the bus through the gaps and recover the cables 3 Fix the assemblies to the flush mount boxes with screws 4 Make the connections of the basic unit and prepare the additional modules Pass the bus cables through the gaps 5 Interconnect the additional modules with the bus as indicated in the schema and then fix the additional modules with the supplied screws...

Страница 4: ... the MIC connection of the basic unit 3 In case the modified frame needs to be removed please be careful during this step as sudden actions may damage the microphone or its cable as indicated above Microphone Microphone LAN PoE RG Y IN1 OUT1 RELAY12 12VDC 2A RESET BUS LINE OUT MIC Note After the connection of the microphone and during the installation of any other modules of the assembly please ho...

Страница 5: ... and place the metallic parts supplied with the frame 2 Place the assembly inside the flush mount box and recover the cables Fix the module with the screws included 3 Connect the cables to the basic unit and interconnect the additional modules with the bus as shown in the schema 4 Fix the blind panel or additional modules that remain in sight with the supplied screws and put the labels with captio...

Страница 6: ... box pass previously the bus through the gaps and recover the cables 3 Fix the assemblies to the flush mount boxes with screws 4 Make the connections of the basic unit and prepare the additional modules Pass the bus cables through the gaps 5 Interconnect the additional modules with the bus as indicated in the schema and then fix the additional modules with the supplied screws 6 Place the frames an...

Страница 7: ... the MIC connection of the basic unit 3 In case the modified frame needs to be removed please be careful during this step as sudden actions may damage the microphone or its cable as indicated above Microphone Microphone LAN PoE RG Y IN1 OUT1 RELAY12 12VDC 2A RESET BUS LINE OUT MIC Note After the connection of the microphone and during the installation of any other modules of the assembly please ho...

Отзывы: