GetFace IP
Flush installation - Frame - 2 modules
ZVP-FFRA2
Assembly instructions
© Zennio Avance y Tecnología S.L.
Ed. 1
For more info
Page
1
/
2
Note:
This product must be purchased together with the frame ZVP-FBOX2
ASSEMBLY OF FRAME (ONE-COLUMN LAYOUT)
1
Please remove the basic unit blind panel and place the
auxiliary parts supplied with the frame.
2
Place the basic unit inside the flush-mount box and recover
the cables. Fix the enclosure with the screws (included).
3
Connect the cables to the basic unit and interconnect the
additional modules with the bus.
4
. Fix the blind panel (or additional modules that remain in
sight) with the supplied screws and put the labels with captions
next to the buttons.
5
Place the frame.
6
Fix the frame by using the supplied Allen key.