Meter Installation 

 

To achieve optimal measurement results, (3) 

times the pipe diameter should be allowed 

on the inlet and (2) times the pipe diameter 

should be allowed on the outlet side of the 

meter. However, ZSU Ultrasonic Meters are 

designed to be installed without straight sec-

tions in front and after the meter and still 
meet AWWA accuracy standards.  

 

Clean and flush the service line thoroughly 
on the inlet side of the meter before in-
stalling. 

 

The pipe cross section should not be re-
duced directly in front of and behind the me-
ter. 

 

Valves or other flow regulators should be 
installed, where possible, behind the meter. 

 

The meter should be installed, where possi-
ble, at the deepest point of the pipe installa-
tion insuring air is not entrapped within the 
meter and the meter body is always com-
pletely water filled.  

 

During installation, ensure the flow arrow 
indicator on the meter housing is pointed to-
ward the customer’s side of the service line. 
Install using new bolts and gaskets.

 

 

To insure unrestricted flow of water through 
the meter, use the proper size and type of 
gaskets. Connections should only be suffi-
ciently tight to seal; do not over-tighten. 
Flange gaskets must not extend into the 
pipe.

 

 

If necessary, the meter should be protected 
by a strainer. This will keep foreign matter, 
such as stones or debris, from entering the  
meter and potentially cause damage.

 

 

The meter is designed for use in a frost-

proof location with ambient temperature not 

to 130°F and with water tempera-

tures not to 122°F . 

 

To prevent damage during the installation 

process, ensure that the meter is slowly 

filled with water. 

 

Activating the Meter 

Upon delivery, the display of the meter will ar-

rive in “sleep mode”. To activate the meter, 

simply fill the meter with water for ten seconds. 

This will move the meter into active reading 

mode. During the installation, all air must be 

ventilated from the meter and the meter must 

be completely filled with water in order for acti-
vation to be achieved. 

 

Once the meter has been activated, an automat-

ic display check takes place (segment test). The 

segment test is represented by three flashes of 

all segments on the display indicator and is re-

peated every 60 seconds during operation. 

 

 

Readout options of the ZSU meter via the 

NFC (Near Field Communication) Interface 

Cable 

The following data can be directly read from the 

measuring instrument via the NFC interface, e.g. 
with NFC-capable smartphone: 

 

 

Meter ID (serial number) 

 

Current consumption value or total volume 

in the case of an overrun 

 

Up to 15 previous month’s values 

 

Software version 

 

Alarms or error messages 

 

The meter can be retrofitted with NDC modules, 

or ordered with a factory-fitted module. 

 

Содержание ZSU02

Страница 1: ... cold water applications up to 122 F Intended purpose For the consumption measurement of drink ing water up to 122 F For the consumption measurement of non potable water up to 122 F Comment This installation manual is intended for qualified meter installers only Basic installation steps are therefore not described In order to ensure a proper flow measurement the meter must be completely filled wit...

Страница 2: ...t extend into the pipe If necessary the meter should be protected by a strainer This will keep foreign matter such as stones or debris from entering the meter and potentially cause damage The meter is designed for use in a frost proof location with ambient temperature not to exceed 130 F and with water tempera tures not to exceed 122 F To prevent damage during the installation process ensure that ...

Страница 3: ...after the deci mal place 10 to 12 9 digit with no decimal place Unit of consumption display CF Consumption value Cubic Meters 2 to 4 9 digit with 3 digits after the deci mal place 6 to 10 9 digit with 2 digits after the deci mal place 12 9 digit with 1 digit after the decimal place Unit of consumption display m Consumption value US Gallons 2 to 4 9 digit with 1 digit after the deci mal place 6 to ...

Страница 4: ...L Inches 10 12 14 18 20 17 3 4 19 11 16 Height H Inches 5 5 8 7 1 2 8 3 4 10 5 8 12 5 8 15 3 16 18 1 8 Height H1 Inches 2 3 5 16 4 3 32 5 5 16 6 5 16 7 5 8 9 1 16 Flange diameter also width D Inches 6 7 1 2 9 11 13 1 2 16 19 Bolt circle diameter D1 Inches 4 1 2 6 7 1 2 9 1 2 11 3 4 14 1 4 17 Number of bolts per flange Pcs 2 4 8 8 8 12 12 Bolt size Inches 5 8 5 8 5 8 3 4 3 4 7 8 7 8 Weight approx P...

Страница 5: ...ding Example for Maximum LCD Display LCD Display Shown at Left Registration 5 8 to 1 ZSUR Residential 1 2 3 4 5 6 7 8 9 123 456 789 Cubic Feet 999 999 999 Cubic Feet 1 1 2 ZSUR Residential 2 to 3 ZSU 1 2 3 4 5 6 7 8 9 1 234 567 89 Cubic Feet 9 999 999 99 Cubic Feet 4 to 8 ZSU 1 2 3 4 5 6 7 8 9 12 345 678 9 Cubic Feet 99 999 999 9 Cubic Feet 10 to 12 ZSU 1 2 3 4 5 6 7 8 9 123 456 789 Cubic Feet 999...

Страница 6: ...Example for Maximum LCD Display LCD Display Shown at Left Registration 5 8 to 1 ZSUR Residential 1 2 3 4 5 6 7 8 9 12 345 6789 Cubic Meters 99 999 9999 Cubic Meters 1 1 2 ZSUR Residential 2 to 4 ZSU 1 2 3 4 5 6 7 8 9 123 456 789 Cubic Meters 999 999 999 Cubic Meters 6 to 10 ZSU 1 2 3 4 5 6 7 8 9 1 234 567 89 Cubic Meters 9 999 999 99 Cubic Meters 12 ZSU 1 2 3 4 5 6 7 8 9 12 345 678 9 Cubic Meters ...

Страница 7: ... Example for Maximum LCD Display LCD Display Shown at Left Registration 5 8 to 1 ZSUR Residential 1 2 3 4 5 6 7 8 9 1 234 567 89 US Gallons 9 999 999 99 US Gallons 1 1 2 ZSUR Residential 2 to 4 ZSU 1 2 3 4 5 6 7 8 9 12 345 678 9 US Gallons 99 999 999 9 US Gallons 6 to 8 ZSU 1 2 3 4 5 6 7 8 9 123 456 789 US Gallons 999 999 999 US Gallons 10 to 12 ZSU 1 2 3 4 5 6 7 8 9 1 234 567 890 US Gallons 9 999...

Отзывы: