Page 30 of 32
802700NZ - Commercial Installation Instructions - Aug 2015 - V2.01
NOTE:
For any subsequent fi lter changes or any operational
procedures, please refer to the Celsius user guide, located inside
the fi lter housing access door.
Commissioning
7.3
-
Boiling Calibration (B160 and B240 Models)
Boiling Water
03:01 PM, TUE 12, Feb 2013
Boiling
To start press
Calibrate
button
To
Calibrate
Steam Vent
97.5
53.0
EL
•
Press the calibration button and the system will
commence the Boiling calibration procedure. This
will take aprox 5-6 minutes.
1. Press the [MENU] button for main menu.
2. Press the [Install] button.
3. Press the [Booster] button.
4. In the next screen, press YES to enable the Booster.
5. Turn the Booster ON
6. Water must be run through the Booster for a min of 30
seconds, before the heater will activate.
7. Dispense boiling water for 30secs and check the
Booster outlet hose is warm when the boiling water
tank is replenishing.
HydroTap Booster Screen
7.4
-
Booster (B240 Model)
•
Upon completion, a Booster reminder screen will
appear and allow you to return home by pressing
the [Home] button.
•
Check the Date and Time settings (See Note
below)
To enabled when a Booster unit is installed.
Note:
failing to make the correct selection for the “Booster”, will affect product performance.
Note:
Depending on your location you may need to re-set the internal clock. See section G of the user guide
to check and if necessary, reset the Date and Time for your time zone.