
9
The method of disassembly is subject to the instructions of the
Microinverter, and please confirm the warranty terms of the
microinverse before disassembly.
Tips:
5.3.3 Disconnection
EN
Tips:
According to the government's regulations and to ensure safety, the
Microinverter can only start working after connecting to a powered grid
for 5 minutes. To improve the accuracy of the data, the system will verify
and validate it for 15 minutes before showing it on the app.
Before installation, please check all accessories and prepare the
following tools (tools are not included in the purchase )
Phillips Screwdriver
Hexagon Wrench
Work Gloves
Electric Drill
Marker Pen
Tape Measure
Tips:
• If you wish to verify and commission your solar system immediately,
complete the installation when the weather is sunny.
• It is recommended that at least two people participate in the installation.
• Please remember whether connecting or disconnecting Smart PV Hub
with AB1000, solar panels or Mroinverters.make sure SolarFlow is turned
off by pressing and hold the loT button for 6 seconds.
A. Disconnect the solar panel,Microinverter and the home grid
B. Install Smart PV Hub
C. Install Smart Microinverter
D. Find a place to stack AB1000
E. Connect the top one AB1000 to the Smart PV Hub
F. Connect the Microinverter to home grid
G. Connect the solar panels to the Smart PV Hub
H. Scan the QR code and download the Zendure app. Follow the
instructions of the app to set up device.After 20 minutes, you will get
the SolarFlow power storage system's data on your Zendure app.
5.3 Installation
5.3.1 Installation Steps Overview
5.3.2 Installation Tools
Содержание Smart PV Hub 1200 Controller
Страница 1: ...SolarFlow User Manual support eu zendure com...
Страница 2: ......
Страница 133: ...5 Zendure SolarFlow 5 Zendure 20 IoT Smart PV Hub 6 1000 Smart PV Hub AB1000 4 UK Cd Hg Pb...
Страница 138: ...10 UK 1 1 2 2 3 4 3 4...
Страница 140: ...12 UK 1 2 2 1 2 1 2 1 3 Smart PV Hub 8 3 3 1 2 4 5 1 2 3 4 5 5 3 6 AB1000 1 1 2 2 1 2 1 2 1000 1000...
Страница 143: ...15 UK B1000 20 Zendure 20 1 2 3...
Страница 147: ......