5. Single & Dual Cooling System Commissioning Steps

Important Safety Warning 

BEFORE PLUGGING THE EXTERNAL CONDENSER POWER CABLES 
(ORANGE AND GREY) TO THE BACK OF THE ZELLA PRO. ENSURE 
THE COOLING SYSTEM RCD IS OFF ON THE BASE MOUNTED 
SWITCHBOARD

You also have the option to unplug the cooling system/s power 
cables from the back of the switchboard during the commissioning 
process

PLEASE ENSURE THERE IS POWER TO THE Zella Pro 
(SWITCHBOARD) BEFORE COMMISSIONING THE COOLING SYSTEM

5.1 Condenser

Depending on the model and cooling capacity the condenser 
maximum distance can vary between 20 and 30 meters. The Zella 
Pro is supplied with relevant cable length (3 core orange output 
to condenser & 4 core grey cable. The condenser draws its power 
from the Zella Pro. The condenser size and weight can also vary 
depending on model and cooling capacity. The condenser will be 
positioned either on the outer wall of the building or on the roof.

5.2 Commissioning

Once the Zella Pro has been positioned in its proposed location and 
connected to power the air conditioning contractor can commission  
the cooling system. 

Only once the air conditioning contractor has Connected wires to 
the condenser and plugged the grey and orange cable into the Zella 
Pro, can the cooling be turned on. 

ENSURE THE COOLING SYSTEM PLUG IS PLUGGED INTO THE 
CORRECT POWER  SOCKET ON THE SWITCHBOARD

5.3 Wiring

The Zella Pro is supplied with all the cables (orange and grey) 
which is pre-coiled and ready to be run with the copper piping 
during the commissioning process. The pre-coiled condenser 
cables are located inside the Zella Pro.

CONTRACTORS TO ENSURE BOTH ORANGE AND GREY CABLES 
ARE LOCKED BY TURNING THE YELLOW DISK ON THE SIDE OF THE 
CABLE PLUGS WITH A SCREW DRIVER. THE AIR CONDITIONING 
CONTRACTOR MUST SUPPLY THEIR OWN COPPER PIPING.

WIRING TABLE (WHITE CABLE)

1 - Live

Red / Brown

2 - Neutral

Blue / Black

3 - Signal

White

Green / Yellow

Earth / Ground

WIRING TABLE (ORANGE CABLE)

1 - Live

Red / Brown

2 - Neutral

Blue / Black

Green / Yellow

Earth / Ground

Содержание Pro 12

Страница 1: ...zelladc com Installation Manual Modular Micro Data Centre Solutions...

Страница 2: ...ntroduction 3 2 Safety Instructions 4 3 Power Connection 5 4 Access Control 8 5 Single Dual Cooling System Commissioning Steps 9 6 PDView Access 15 7 Pyrorack Commissioning User Guide 18 8 Start up Re...

Страница 3: ...ly reducing operational and energy costs by 30 60 and on premise IT footprint Moreover it allows for portability and can be moved from location to location and expanded to a set of modular data centre...

Страница 4: ...ance Important safety note z Caution needs to be taken when removing the side panels of the Micro Data Centre in particular when dealing with the 38U as they are heavy We recommend a 2 man lift when r...

Страница 5: ...MEND THAT INSTALLATION SHOULD ONLY BE CARRIED OUT BY SUITABLY QUALIFIED ELECTRICAL CONTRACTOR WITH THE NECESSARY TRAINING 3 2 Switchboard Operation Following the connection to mains power DEPENDING ON...

Страница 6: ...3 Power Connection 3 3 Power Supply diagram to PDU switchboard Non monitored sockets UPS Power Cooling system Cooling system RCD Mains power...

Страница 7: ...3 Power Connection 3 4 Switchboard layout Front View Rear View...

Страница 8: ...ened by the push button located inside the Zella Pro See user manual for programming options Use card reader until you are ready for biometric access mode 4 3 L E D Key Pad Operation The default code...

Страница 9: ...of the building or on the roof 5 2 Commissioning Once the Zella Pro has been positioned in its proposed location and connected to power the air conditioning contractor can commission the cooling syste...

Страница 10: ...Pro base mounted switchboard and orange cooling system plug is unplugged from rear of switchboard Grey cable termination in condenser supplies power back to the Zella Pro 4 core cable 1 Brown 2 Blue...

Страница 11: ...iring cont PLEASE NOTE WHEN PLUGGING THE CABLE CONNECTORS YOU SHOULD HEAR A CLICK TO CONFIRM CONTACT AFTER INSERTING THE PLUG ENSURE BOTH ORANGE AND GREY CABLES ARE LOCKED BY TURNING THE YELLOW DISK O...

Страница 12: ...is available on the market Please note Pipe size is 9 5mm for cooling capacity 2kw up to 3 5kw See enclosed manual with condenser Gas side Liquid side Gas pipe thermal insulation Liquid pipe thermal...

Страница 13: ...complete 0 11 2 3 30 3 05 0 6 78 309 0 1 031 0 0 305 0 11 2 3 3 3 02 0 11 0 0 5 0 11 6 3 5 30 8 0 3 0 3 6 6 34 1 2 56 3 0 6 A3 BC ADEF GHI 3 06 A3 B 1 7 5 139 0 0 6 4 J70 11 3 02 3 0 0 311 5 139 0 8...

Страница 14: ...turning cooling system off from the permanent supply and plug into Cooling systems 1 2 outlets 11 One system will be operation following this step 12 Installation complete 0 11 2 3 0 3 05 0 6 78 309 0...

Страница 15: ...admin b Password zellabox c Accept the terms of use check box d Once connected to the PDU the following similar image should appear 4 Access the network icon located at the bottom of the screen If you...

Страница 16: ...enter Use the following to access Login admin Password zellabox Accept the terms of use check box OPTION 3 To access the Zella Pro PDU through a network switch or something similar follow these steps...

Страница 17: ...sign the desired IP address to the PDU by referring to OPTION 1 above Plug network cable switch directly into the PDU Access the PDU through local Display If you have any questions please contact Zell...

Страница 18: ...cidental discharge will occur if this guide is not followed step by step For effective and safe installation follow the steps below See cannister connection quick guide Please note Accidental discharg...

Страница 19: ...r to the Pyrorack by inserting 7 the plug and tightening the washer 8 Reinsert the canister back into the Pyroack 9 Place the Pyrorack into position top of the Zella Pro 10 7 3 Commissioning Steps 1 F...

Страница 20: ...d 2 by pressing the isolate zones buttons located on the front panel 3 A beeping sound will continue intermittently as a reminder 4 Once you have completed work within the MDC and you are ready to clo...

Страница 21: ...Follow commissioning steps MAG UNIT FUSE F3 500mA TL D CONN MALE J2 D CONN FEMALE J1 BATTERY FUSE F4 500mA TL MANS FUSE F5 500mA TL 7 7 Important tips Before working within the Zella Pro ALWAYS ensur...

Страница 22: ...alled z Switch UPS switch to the ON position z Switch all remaining switches to the ON position 2 Follow Pyrorack Commissioning steps from the installation manual 3 Populate the Micro Data Centre with...

Страница 23: ...error Scalability as needed Energy and noise efficiency Local storage fast processing Over a decade ago Zella DC pioneered the micro data centre Since then our next generation server rooms have been p...

Отзывы: