Preparations for use
INTRABEAM Water Phantom
Version 6.2
Page 26
G-30-1767-en
•
Unscrew the cover of the required measuring chamber and lay it aside.
•
Remove the ionization chamber holder from the open measuring cham-
ber.
The ionization chamber holder is used to mount and exactly position the IC
ionization chamber in the measuring chamber.
•
Place the IC ionization chamber in the ionization chamber holder.
•
Push the ionization chamber holder with the IC ionization chamber into
the measuring chamber.
Close the measuring chamber again.
A groove is provided in the measuring chamber and the cover of the meas-
uring chamber as a cable feedthrough.
In order to prevent the cable of the IC ionization chamber from being crushed
when screwing on the measuring chamber cover, you must sure that the IC
ionization chamber cable is lying in this groove.
•
Screw the cover of the measuring chamber back on.
NOTE
Using a damaged IC ionization chamber, you would obtain either no meas-
urement results at all or false measurement results.
•
Do not use a damaged IC ionization chamber.
NOTE
If you use any ionization chamber holder other than the original ionization
chamber holder belonging to the INTRABEAM Water Phantom, you may ob-
tain false measurement results. I.e. your measurement results will deviate sig-
nificantly from the values of the calibration file.
•
Use only the ionization holder belonging to the INTRABEAM Water Phan-
tom.
Содержание INTRABEAM
Страница 1: ...ZEISS INTRABEAM Water Phantom Instructions for Use G 30 1767 en Version 6 2 2022 02 24...
Страница 4: ...INTRABEAM Water Phantom Version 6 2 Page 4 G 30 1767 en Blank page for your notes...
Страница 15: ...Version 6 2 G 30 1767 en Page 15 INTRABEAM Water Phantom Safety measures Blank page for your notes...
Страница 17: ...Version 6 2 G 30 1767 en Page 17 INTRABEAM Water Phantom Safety measures Fig 1 Symbols and labels 1 2 3...
Страница 28: ...Preparations for use INTRABEAM Water Phantom Version 6 2 Page 28 G 30 1767 en Blank page for your notes...
Страница 45: ...Version 6 2 G 30 1767 en Page 45 INTRABEAM Water Phantom Operation Blank page for your notes...
Страница 47: ...Version 6 2 G 30 1767 en Page 47 INTRABEAM Water Phantom Operation...
Страница 49: ...Version 6 2 G 30 1767 en Page 49 INTRABEAM Water Phantom Operation Blank page for your notes...
Страница 74: ...System data INTRABEAM Water Phantom Version 6 2 Page 74 G 30 1767 en Blank page for your notes...
Страница 80: ...Index INTRABEAM Water Phantom Version 6 2 Page 80 G 30 1767 en Blank page for your notes...
Страница 81: ...Version 6 2 G 30 1767 en Page 81 INTRABEAM Water Phantom Blank page for your notes...