Preparations for use
INTRABEAM Water Phantom
Version 6.2
Page 24
G-30-1767-en
•
Always insert the XRS 4 into the water phantom alone or with an applica-
tor from the INTRABEAM range of accessories.
Use the water phantom only in connection with the INTRABEAM to determine
the depth dose rate or isotropy of an XRS 4.
Preparatory workflow
The most important steps for preparing the water phantom are:
–
Place the water phantom on a stable, level table.
–
Remove a cover of the water tank filler opening.
–
Fill water tank with deionized water up to the upper edge of the viewing
window.
–
Reattach the cover of the water tank properly.
–
Select the measuring chamber and unscrew the cover.
–
Remove the IC ionization chamber holder from the open measuring cham-
ber.
–
Insert the IC ionization chamber in the ionization chamber holder.
–
Insert the ionization chamber holder in the measuring chamber.
–
Screw the cover of the measuring chamber back on.
–
Let the water phantom with the filled water tank and the IC ionization
chamber inserted in one of the measuring chambers adapt to room tem-
perature.
NOTE
If the user fills the water tank with liquids other than deionized water, incor-
rect measuring results may be obtained.
•
Use the water phantom only if the water tank is filled with deionized wa-
ter up to the upper edge of the viewing window.
NOTE
Incorrect measured values may be obtained if you do not have the IC ioniza-
tion chamber calibrated at the prescribed intervals.
•
Observe the calibration intervals specified by the manufacturer of the IC
ionization chamber and comply with the relevant requirements applica-
ble in your country.
Содержание INTRABEAM
Страница 1: ...ZEISS INTRABEAM Water Phantom Instructions for Use G 30 1767 en Version 6 2 2022 02 24...
Страница 4: ...INTRABEAM Water Phantom Version 6 2 Page 4 G 30 1767 en Blank page for your notes...
Страница 15: ...Version 6 2 G 30 1767 en Page 15 INTRABEAM Water Phantom Safety measures Blank page for your notes...
Страница 17: ...Version 6 2 G 30 1767 en Page 17 INTRABEAM Water Phantom Safety measures Fig 1 Symbols and labels 1 2 3...
Страница 28: ...Preparations for use INTRABEAM Water Phantom Version 6 2 Page 28 G 30 1767 en Blank page for your notes...
Страница 45: ...Version 6 2 G 30 1767 en Page 45 INTRABEAM Water Phantom Operation Blank page for your notes...
Страница 47: ...Version 6 2 G 30 1767 en Page 47 INTRABEAM Water Phantom Operation...
Страница 49: ...Version 6 2 G 30 1767 en Page 49 INTRABEAM Water Phantom Operation Blank page for your notes...
Страница 74: ...System data INTRABEAM Water Phantom Version 6 2 Page 74 G 30 1767 en Blank page for your notes...
Страница 80: ...Index INTRABEAM Water Phantom Version 6 2 Page 80 G 30 1767 en Blank page for your notes...
Страница 81: ...Version 6 2 G 30 1767 en Page 81 INTRABEAM Water Phantom Blank page for your notes...