background image

16

Corona process  |  User Manual

Device description

Corona process

3.2.3  Electrical connections

Fig. 4 

POWER 12–24V

IN OUT

ETHERNET

1

2

3

Electrical connections

"ETHERNET" connection –  
14-pin socket

"Digital IN OUT" connection –  
10-pin socket

PIN Color  Assignment

bk/wh 

OUT 3

violet 

IN 0

brown 

OUT 2

white 

IN 1

green 

OUT 1

yellow 

IN 2

gray 

OUT 0

pink 

IN 3

9  blue GND
10 red  GND

"12 – 24 V DC POWER" connection (power supply) –  
3-pin socket

PIN 

Wire number 

Assignment

12 – 24  V  DC

2 2 

GND

– 

n. k.

1

2

3

Ethernet cable FVG-2 W

Lemo connector FVG-2 W

1

2
3

4

5

6

7

8

9

10

Lemo connector FVG-2 W

1

2

3

Содержание Corona process

Страница 1: ...User Manual Carl Zeiss Spectroscopy GmbH Corona process...

Страница 2: ...d forwarding and duplication of this document and the utilization and communication of its contents are not permitted Violations shall result in claims for damages All rights reserved in the event of...

Страница 3: ...3 3 1 Scope of supply 13 3 2 Technical design 14 3 2 1 Functional elements 14 3 2 2 Controls and indicators 15 3 2 3 Electrical connections 16 3 2 4 Mechanical interface 17 3 3 Functional description...

Страница 4: ...ting device and the Corona process 23 Fig 9 Connecting system components 25 Fig 10 Selecting the storage location and agreeing to the licensing terms 26 Fig 11 Completing the installation 26 Fig 12 Se...

Страница 5: ...49 Fig 33 Confirming the alignment 49 Fig 34 Positioning the white standard 50 Fig 35 Continuing the white calibration 50 Fig 36 Positioning the black standard 51 Fig 37 Continuing the black calibrat...

Страница 6: ...6 Corona process User Manual Corona process...

Страница 7: ...ffectively Furthermore it will provide you with information on maintenance and troubleshooting Please familiarize youself with the contents of the User Manual and observe all of the general and safety...

Страница 8: ...afety note could result in slight injuries or property damage Note General reference to important or useful information concerning the device and its operation Note Important note on environmental pro...

Страница 9: ...ctives and standards and left our factory in perfect condition To maintain this state and ensure safe operation all instructions and warning notes listed must be observed The following directives stan...

Страница 10: ...ve atmosphere Unplug the power connector of the device only when the device is deenergized Caution GENERAL RISK The Corona process including its original accessories must be used for the purposes desc...

Страница 11: ...in compliance with the applicable legal requirements 2 4 Environmental management Our company has implemented a certified environmental management system that complies with ISO 14001 This product was...

Страница 12: ...particular and improper use The manufacturer shall not be liable for damage caused by faulty operation negligence or any other tampering with the device particularly the removal or replacement of dev...

Страница 13: ...e f e r s c h e i n Corona extreme Gebrauchsanweisung 2 1 3 4 5 7 8 6 Scope of supply Corona process spectrometer Acceptance report Delivery note and other documents accompanying the device Set of doc...

Страница 14: ...ig 2 6 1 5 2 4 3 7 Functional elements Connection panel Ethernet Digital IN OUT power supply and status display Cooling element Carrying handle and mounting interface Device base carrier for the measu...

Страница 15: ...color Description flashing blue after connection to the power supply not lit during initialization max 30 s no light beam visible in measuring window flashing blue after complete initialization no lig...

Страница 16: ...l IN OUT connection 10 pin socket PIN Color Assignment 1 bk wh OUT 3 2 violet IN 0 3 brown OUT 2 4 white IN 1 5 green OUT 1 6 yellow IN 2 7 gray OUT 0 8 pink IN 3 9 blue GND 10 red GND 12 24 V DC POWE...

Страница 17: ...Corona process with optional mounting device in mounting package 000000 2107 066 from Carl Zeiss Spectroscopy GmbH see also Section 4 Variant 2 Fastening of the Corona process via a customer installed...

Страница 18: ...h two redundant halogen lamps and automatically switches over to the second lamp if the first one fails The stainless steel housing and the hygiene standard adhered to the design allow the use of the...

Страница 19: ...cess 1 2 3 4 5 6 90 600 mm Functional description Mounting device in mounting package 000000 2107 066 or customer installed mechanical interface Mounting interface handle Corona process measuring syst...

Страница 20: ...ftware manual is available on the attached CD The Corona process measuring system is approved for use with the following software packages InProcess Aspect Plus The OSIS SDK Software Development Kit 0...

Страница 21: ...10 to 50 C Storage transport tempera ture 40 to 70 C Max humidity 95 non condensing Altitude of operation Up to 2000 m Tab 2 Connection and environmental conditions 4 If you do not use the original m...

Страница 22: ...face with four M8 threaded holes or four through holes with a diameter of 9 mm for fastening the mounting device For the connection dimensions of the mounting device please refer to the illustration b...

Страница 23: ...orona process with the carrying handle 5 in the location holes 4 of the mounting device At the same time note the transport direction of the sample material see note 4 Align the Corona process properl...

Страница 24: ...e Ethernet cable must be less than 100 m max 80 m is recommended or a switch must be interposed To prevent communication problems the use of a second network card for the Corona process is recommended...

Страница 25: ...alling the measuring system Corona process Fig 9 2 3 1 2 1 Connecting system components ETHERNET connection Digital IN OUT connection Protective cap only for Digital IN OUT connection POWER 12 24 V DC...

Страница 26: ...luded on the CD ROM for InProcess Software 1 Start the installation process by double clicking on the setup exe file 2 Select the storage location and agree to the licensing terms 3 Then click on INST...

Страница 27: ...Process software you still must activate the required licenses Note For details on activation of the required licenses please refer to the ZEISS License Activation Manual As soon as you have activated...

Страница 28: ...28 Corona process User Manual Corona process...

Страница 29: ...booted up completely the Status LED flashes blue in one second intervals blue flashing after connection to the power supply not illuminated during initialization max 30 s no light beam is visible in t...

Страница 30: ...a process default lamp is set as the default profile For details on changing the profile refer to the technical description Information on the device profiles of the Corona extreme and Corona process...

Страница 31: ...t and assign a product name to it by clicking on 7 Then select Continuous measurement Fig 14 Select continuous measurement 8 Save the product To do this click on the Save button Fig 15 Save product No...

Страница 32: ...al System Operation Corona process 9 Return to the start screen by clicking on the Home button 10 Click on the Measurement button 11 Start a measurement by clicking on the button for the desired produ...

Страница 33: ...nge to the spare lamp and replace the default lamp if necessary only by instructed personnel Switch measuring system off and on Restart software Signal strength too weak Distance between sample and me...

Страница 34: ...34 Corona process User Manual Help in case of faults Corona process Error Cause Remedy Other errors questions and maintenance work Contact customer service...

Страница 35: ...clean it Caution THERMAL ENERGY HAZARD Let the Corona process measuring system cool down for at least 10 minutes before starting to clean it Follow the safety instructions for handling inflammable liq...

Страница 36: ...ply by third parties Caution GENERAL RISK All specified activities may be performed only by Service staff of Carl Zeiss Spectroscopy GmbH or by properly instructed personnel Caution THERMAL ENERGY HAZ...

Страница 37: ...belonging to the calibration device for the Corona process Phillips screwdriver PH2 for older device versions Open end wrench 8 mm A F Screwdrivers TX10 and TX25 Additionally required tools and acces...

Страница 38: ...ess 2 Removing the Corona process from the mounting device Loosen both clamping screws 1 on the mounting device using a 6 mm Allen screw Pull the Corona process 2 out of the mounting device Fig 18 2 1...

Страница 39: ...Loosen Phillips screws with a PH2 Phillips screwdriver Carefully lift the base of the device 2 by the carrying handle 3 out of the device cover 4 Make sure that you do not feel any resistance while d...

Страница 40: ...nel the default lamp L1 is located on the left side of the device base and the spare lamp L2 is on the right side The corresponding labeling also is affixed to the lamp base Note The procedure for cha...

Страница 41: ...t it will not obstruct further work steps or be damaged Fig 21 1 Disconnecting the lamp cable 6 Unscrewing the lamp holder Unscrew three of the four screws 2 from the lamp base with a TX25 screwdriver...

Страница 42: ...ables run over the lamp holder of the spare lamp Therefore remove the lamp holder of the spare lamp by taking it out at the side Fig 23 2 1 Removing the lamp holder 8 Removing the old halogen lamp Pla...

Страница 43: ...ogen lamp 9 Installing the new halogen lamp see Fig 24 reverse order Put on the cotton gloves Insert the new halogen lamp 4 in the lamp holder 5 Align the new halogen lamp so that the black mark on th...

Страница 44: ...s see Fig 25 4 1 Screw the lamp holder back onto the base with the four screws see Fig 22 2 Plug the lamp cable see Fig 21 1 back onto the lamp socket 11 Inserting the device base in the device cover...

Страница 45: ...white standard with appropriate certificate attached CD Black standard Tools for changing lamps Corresponding instructions Storage box Ethernet cable order no 000000 2036 573 Lab power supply order no...

Страница 46: ...uring system has not yet been configured select it for configuration under the menu option New Fig 27 Selecting a measuring system 3 Selecting the lamp to be calibrated Right click on dev Corona proce...

Страница 47: ...tenance Corona process Note The program sequence must be performed completely for the default lamp and for the spare lamp 4 Resetting the lamp counter Reset the lamp counter by pressing the Yes button...

Страница 48: ...the attached CD which is supplied in a folder in the storage case Compare the report number on the white standard with the one on the CD and select the appropriate csv file Fig 30 Determining the whi...

Страница 49: ...se cover with the supplied cover We recommend that you certify the white standard annually Insert the white standard in the standard holder at position P6 Fig 32 Mounting the white standard Adjust the...

Страница 50: ...axis 1 against the measuring window 4 of the Corona process until it touches the measuring window Fig 34 4 3 2 1 5 Positioning the white standard Fasten the white standard 3 in this position by tighte...

Страница 51: ...ing of the white standard and remove the standard holder from position P1 Replace the white standard with the black standard and position the standard holder in position P2 Fig 36 Positioning the blac...

Страница 52: ...e white standard again fits closely against the measuring window and fix it in this position with the clamping screw see Fig 34 Fig 38 Continuing the distance correction Press the OK button to continu...

Страница 53: ...the distance correction The calibration of the default lamp has been completed successfully and the correction has been saved under the following link C ProgramData ZEISS OSIS Device Fig 39 Saving th...

Страница 54: ...the spare lamp Now calibrate the spare lamp by right clicking on dev Corona process and selecting Calibration of spare lamp Fig 40 Selecting a spare lamp Repeat steps 4 to 10 for the spare lamp The C...

Страница 55: ...m 000000 2102 398 Ethernet cable for Corona 10 m 000000 2119 388 Ethernet cable for Corona 15 m 000000 2058 862 Ethernet cable for Corona 60 m 000000 2146 834 RJ45 connector with insulated ends 000000...

Страница 56: ...able 10 pin 000000 0547 289 Cover cap for Digital IN OUT socket 000000 0583 776 Accessories Flushing rings Name Order number ClearView flange 000000 2164 968 Air purge ring 000000 2192 999 Accessories...

Страница 57: ...utton with connecting cable 5 m 000000 2186 146 Accessories TURNSTEP Name Order number TURNSTEP 000000 2156 193 TURNSTEP adapter for petri dishes 60 mm 000000 0455 055 TURNSTEP adapter for petri dishe...

Страница 58: ...e but should be disposed of in compliance with the relevant legal requirements This product has been developed inspected and produced in accordance with the applicable environmental regulations and di...

Страница 59: ...ers Dimensions W x H x D 360 x 279 x 220 mm Weight 15 0 kg Ambient parameters Operating temperature 10 C to 50 C Storage transport temperature 40 C to 70 C Protection class IP67 ATEX Zone 22 Max humid...

Страница 60: ...al range 380 1650 nm Spectral resolution half tenth value width 10 nm Wavelength accuracy 1 0 nm Wavelength drift 10 pm K Geometry 0 0 Min integration time 3 ms Amplitude digitization 16 bits Measurin...

Отзывы: