manualshive.com logo in svg
background image

ACCURA
Installation site requirements

Coordinate measuring machine (CMM)
Size: 16/24/15, 16/30/15, 16/42/15, 20/24/10, 20/30/10, 20/42/10, 20/24/15, 20/30/15,
20/42/15

Содержание ACCURA

Страница 1: ...ACCURA Installation site requirements Coordinate measuring machine CMM Size 16 24 15 16 30 15 16 42 15 20 24 10 20 30 10 20 42 10 20 24 15 20 30 15 20 42 15...

Страница 2: ...ACCURA Installation site requirements 2021 10 11 61221 1041202...

Страница 3: ...alled CMM 10 Planning and Measuring Lab Preparation 11 General protection measures 11 Doorway dimensions in the measuring lab 11 Room height of the measuring lab 11 Floor 11 Floor plan 11 Vibrations a...

Страница 4: ...20 42 10 bellows cover installation dimensions 30 ACCURA 20 24 15 installation dimensions 31 ACCURA 20 24 15 bellows cover installation dimensions 32 ACCURA 20 30 15 installation dimensions 33 ACCURA...

Страница 5: ...ments 5 Limit curves of permissible floor vibrations at the installation site 47 Permissible foundation acceleration for ACCURA X1600 with active damping 47 Permissible foundation acceleration for ACC...

Страница 6: ...ACCURA Installation site requirements 6...

Страница 7: ...Coordinate measuring machine CMM Controller cabinet Control console Data system and peripheral devices optional Note on data systems NOTE Data systems for coordinate measuring machines are CMM based s...

Страница 8: ...unload and transport to the storage location or installation site suitable transportation equipment and operat ing personnel must be provided The type of transport equipment depends on the local cond...

Страница 9: ...0700 Truck Pallet 5680 2900 3250 1240 19740 20 24 10 Air sea Crate 3870 3180 2970 36 5 1665 14365 Truck Pallet 3870 3180 2800 960 13660 20 30 10 Air sea Crate 4500 3180 2970 42 5 2240 17240 Truck Pall...

Страница 10: ...only be removed by a ZEISS service engineer NOTE Packing materials such as disposable transport packaging for the covers PC and accessories foil or Styrofoam chips can be returned to ZEISS if they are...

Страница 11: ...a floor plan ensure that your coordinate measuring machine can be easily accessed from all sides Installation near transport routes must be avoided Vibrations at the installation site Vibrations are...

Страница 12: ...on Note Humidity values that exceed the permissible range require an additional air conditioner on the con troller cabinet 40 70 Ambient temperature 10 35 C Height above mean sea level 100 125 V 3000...

Страница 13: ...10 l min at 5 bar 50 Nl min at 1 bar Compressed air connection point The compressed air line must be equipped with a lockable separator and a pressure release system for the compressed air connection...

Страница 14: ...against being turned on again uninten tionally Warning some components in the controller cabinet remain live even when the main switch is turned off These places are marked with warning signs If nece...

Страница 15: ...iving areas In such cases opera tors may be required to implement appropriate measures at their own expense For peripheral devices e g computer monitor etc the specifications of the respective manufac...

Страница 16: ...connection with a circuit breaker Alternatively equivalent protective equipment can also be used We rec ommend installing a lightning arrester e g Phoenix Flashtrab FLT 25 400 for general protection...

Страница 17: ...current circuit breaker 4 Cable included with delivery 5 Main switch 6 Shock proof outlet Note For maintenance work on the CMM Network connection A network connection is required for Data backup Teles...

Страница 18: ...cted towards the CMM Only for MCC 800 the distance between the back of the controller cabinet and the wall must be at least 500 mm When the back is fully open the distance to the wall must be at least...

Страница 19: ...lower edge of granite plate Height between the granite plate and lower edge of the sty lus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the height is somewhat less N...

Страница 20: ...ecured CMM assembly from lower edge of granite plate Height between the granite plate and lower edge of the sty lus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the...

Страница 21: ...lower edge of granite plate Height between the granite plate and lower edge of the sty lus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the height is somewhat less N...

Страница 22: ...ecured CMM assembly from lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the h...

Страница 23: ...lower edge of granite plate Height between the granite plate and lower edge of the sty lus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the height is somewhat less N...

Страница 24: ...ecured CMM assembly from lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the h...

Страница 25: ...lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the height is somewhat less N...

Страница 26: ...secured CMM assembly from lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the...

Страница 27: ...lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the height is somewhat less N...

Страница 28: ...secured CMM assembly from lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the...

Страница 29: ...lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the height is somewhat less N...

Страница 30: ...secured CMM assembly from lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the...

Страница 31: ...lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the height is somewhat less N...

Страница 32: ...secured CMM assembly from lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the...

Страница 33: ...lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the height is somewhat less N...

Страница 34: ...secured CMM assembly from lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the...

Страница 35: ...lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the height is somewhat less N...

Страница 36: ...secured CMM assembly from lower edge of granite plate Height between the granite plate and lower edge of the stylus mounting cube on the VAST XT gold probe With other VAST gold or RDS probe types the...

Страница 37: ...tored A risk due to travel movements is thus reduced to a minimum Once the protected area is cleared the CMM moves again at maximum speed Using floor markings mark the boundary of the protective field...

Страница 38: ...d information ACCURA with active damping Alignment of air dampers for X1600 The base is comprised of four air dampers and four leveling units which are suitable for screed floors as per DIN 18560 The...

Страница 39: ...ce for center to center distance of the air dampers 10 mm Note The tolerances must not be exceeded Floor load Measuring range X Y Z mm Value N mm2 Mean surface pressure on the 4 support surfaces 1600...

Страница 40: ...50 850 2890 750 0 0 2250 1100 3840 750 0 0 2250 530 530 384 3740 4940 3140 1 Outer edge of granite table 2 Air damper BiAir3 with leveling unit 3 Air damper BiAir4 with leveling unit Tolerances for th...

Страница 41: ...70 1870 2070 2270 2470 0 Y X 474 0 1 2 3 4 5 6 7 8 148 5 200 1600 374 2470 2400 176 7 3140 M12 96x 2 1 3 674 874 1074 1274 1474 1674 1874 Left Y guideway Right Y guideway Measuring range Threaded inse...

Страница 42: ...0 2870 0 Y X 474 0 1 2 3 4 5 6 7 8 148 5 200 1600 374 2470 3000 176 7 3740 M12 120x 2 1 3 674 874 1074 1274 1474 1674 1874 Left Y guideway Right Y guideway Measuring range Threaded insert 4 x M36 for...

Страница 43: ...0 Y X 474 0 1 2 3 4 5 6 7 8 148 5 200 1600 374 2470 4200 176 7 4940 M12 168x 19 18 17 20 21 2 1 3 674 874 1074 1274 1474 1674 1874 Left Y guideway Right Y guideway Measuring range Threaded insert 4 x...

Страница 44: ...5 705 905 1105 1305 1505 1705 1905 2105 2305 0 1 2 3 4 5 6 7 8 9 10 148 5 200 2000 400 2910 2400 176 7 3140 M12 120x 2 1 3 Left Y guideway Right Y guideway Measuring range Threaded insert 4 x M36 for...

Страница 45: ...0 Y X 505 705 905 1105 1305 1505 1705 1905 2105 2305 0 1 2 3 4 5 6 7 8 9 10 148 5 200 2000 400 2910 3000 176 7 3740 M12 150x 2 1 3 Left Y guideway Right Y guideway Measuring range Threaded insert 4 x...

Страница 46: ...0 505 705 905 1105 1305 1505 1705 1905 2105 2305 0 1 2 3 4 5 6 7 8 9 10 4200 176 7 4940 M12 210x 148 5 200 2000 400 2910 Y X 2 1 3 Left Y guideway Right Y guideway Measuring range Threaded insert 4 x...

Страница 47: ...re an additional foundation 0 1 1 10 100 1000 0 10 20 30 40 50 Vibration acceleration mm s Frequency Hz X axis horizontal Y axis horizontal Z axis vertical Permissible foundation acceleration for ACCU...

Страница 48: ...ACCURA Installation site requirements 2021 10 11 61221 1041202...

Отзывы: