Operation
S100 / OPMI pico
Version 7.0
Page 128
G-30-1781-en
Powering the system up and down
Prerequisites
The correct rated voltage has been set on the suspension system (please
refer to Page 108).
The included power cord (floor stand) is connected (please refer to
Page 108).
The light guide is connected (please refer to Page 98).
Proceed as follows to power the system up and down:
• Press the power switch (1) on the suspension system.
Before starting to work with the system, you have to perform a function test
(see next page). This permits you to check the system configuration and user-
specific settings and to reconfigure them, if necessary.
1
Содержание 000000-1080-349
Страница 1: ...ZEISS S100 OPMI pico Instructions for Use G 30 1781 en Version 7 0 2015 09 09...
Страница 4: ...S100 OPMI pico Version 7 0 Page 4 G 30 1781 en...
Страница 6: ...S100 OPMIpico Version 7 0 Page 6 G 30 1781 en...
Страница 49: ...Version 7 0 G 30 1781 en Page 49 S100 OPMI pico Safety Measures Fig 21 Video units 1 2 4 1 2 3...
Страница 50: ...Safety Measures S100 OPMI pico Version 7 0 Page 50 G 30 1781 en...
Страница 88: ...System Overview S100 OPMI pico Version 7 0 Page 88 G 30 1781 en...
Страница 111: ...Version 7 0 G 30 1781 en Page 111 S100 OPMI pico Preparations for use Fig 57 Connecting the HD video camera 4 2 1 3 5...
Страница 115: ...Version 7 0 G 30 1781 en Page 115 S100 OPMI pico Preparations for use...
Страница 126: ...Preparations for use S100 OPMI pico Version 7 0 Page 126 G 30 1781 en...
Страница 169: ...Version 7 0 G 30 1781 en Page 169 S100 OPMI pico Operation...
Страница 175: ...Version 7 0 G 30 1781 en Page 175 S100 OPMI pico Operation...
Страница 264: ...Indexes S100 OPMI pico Version 7 0 Page 264 G 30 1781 en...
Страница 276: ...S100 OPMI pico Version 7 0 Page 276 G 30 1781 en...
Страница 277: ...Version 7 0 G 30 1781 en Page 277 S100 OPMI pico Blank page for your notes...