background image

15

Water system 
balancing

A complete knowledge of the 
hydronic system, including its 
components and controls, is 
essential to proper water system 
balancing and should only be 
completed by a qualified expert. The 
system must be complete, and all 
components must be in operating 
condition before beginning the water 
system balancing procedures.

Each hydronic system has different 
operating conditions depending on 
the devices and controls installed for 
the particular application. The actual 
balancing technique may vary from 
one system to another.

After the proper system operation 
is established, the appropriate 
operating conditions such as 
water temperatures, flow rates and 
pressure drops should be recorded 
for future reference.

Before and during water system 
balancing, conditions may exist due 
to incorrect system pressures which 
may result in noticeable water noise 
or undesired valve operation. After 
the entire system is balanced, these 
conditions will not exist on properly 
designed systems. If any of these 
conditions persist, recheck the 
system for air that may not have been 
properly vented during start-up.

Water treatment

Proper water treatment is 
a specialized industry and 
therefore it is recommended 
to consult an expert in this 
field to analyze the water for 
compliance with the water 
quality parameters listed below 
and to specify the appropriate 
water treatment program. The 
expert may recommend rust 
inhibitors, scaling preventative, 
antimicrobial growth agents or 
algae preventatives. Anti-freeze 
solutions, glycols, may also be 
used to lower the freezing point.

Water content

Required concentration

Sulphate

< 200 ppm

pH

7.0 – 8.5

Chlorides

< 200 ppm

Nitrate

< 100 ppm

Iron

< 4.5 mg/L

Ammonia

< 2.0 mg/L

Manganese

< 0.1 mg/L

Dissolved solids

< 1000 mg/L

Calcium carbonate hardness

300 – 500 ppm

Calcium carbonate alkalinity

300 – 500 ppm

Particulate quantity

< 10 ppm

Particulate size

800 micron max

All Zehnder Rittling water coils 
are constructed of copper tubes 
and brass headers. It is the end 
user’s responsibility to ensure 
that any of the water delivery 
components are compatible with 
the treated water.

Failure to provide proper water 
quality will void the fan coil unit’s 
warranty.

Water system balancing and treatment

Содержание SL

Страница 1: ...i Cooling Fresh Air Clean Air Heating Rittling Cabinet Convectors Installation Operation and Maintenance...

Страница 2: ...andling and installation 12 Hot water connections 13 Exposed unit touch up 14 Heating system 14 Water system balancing 15 Water treatment 15 Maintenance 16 Equipment start up checklist 16 Replacement...

Страница 3: ...Models Floor models Wall models FL Floor flat top SF Floor sloped top WL Wall flat top RL Wall semi recessed PL Wall fully recessed SL Wall sloped top 1 Models...

Страница 4: ...880 9648 10416 36 12720 13080 14112 14688 11760 12144 13776 14136 40 14376 14784 15936 16584 13200 13656 14856 16008 48 17664 18096 19560 20376 16320 16776 17760 19656 52 19248 19752 21336 22224 17712...

Страница 5: ...andard element Inlet opening L H 1 3 8 Floor flat top Standard dimensions Nominal heights H 18 20 26 32 Nominal lengths L 24 28 36 40 48 52 60 64 Nominal depths D 4 6 8 Any combination of length heigh...

Страница 6: ...ille Standard element Inlet opening L 1 8 H 1 3 8 Floor sloped top Standard dimensions Nominal heights H 18 20 26 32 Nominal lengths L 24 28 36 40 48 52 60 64 Nominal depths D 4 6 8 Any combination of...

Страница 7: ...n L Wall flat top Standard dimensions Nominal heights H 18 20 26 32 Nominal lengths L 24 28 36 40 48 52 60 64 Nominal depths D 4 6 8 Any combination of length height and depth is available Contact fac...

Страница 8: ...Standard element Inlet opening L 3 L H 3 1 3 8 Wall semi recessed Standard dimensions Nominal heights H 14 18 20 24 26 32 Nominal lengths L 20 24 28 32 36 40 44 48 52 56 60 64 Nominal depths D 4 6 8 A...

Страница 9: ...s Outlet grille L 1 8 H 1 3 8 Wall sloped top Standard dimensions Nominal heights H 18 20 26 32 Nominal lengths L 24 28 36 40 48 52 60 64 Nominal depths D 4 6 8 Any combination of length height and de...

Страница 10: ...ment Inlet opening L 3 L H 3 1 3 8 Wall fully recessed Standard dimensions Nominal heights H 18 20 26 32 Nominal lengths L 24 28 36 40 48 52 60 64 Nominal depths D 4 6 8 Recessed depths R 3 3 4 5 3 4...

Страница 11: ...ed during unloading must be reported to the shipping company within 15 days of receipt of the shipment All units are shipped F O B factory Therefore Zehnder Rittling is not responsible for damage duri...

Страница 12: ...cable codes Only trained and qualified service personnel using good judgment and safe practices should install repair and or service air conditioning equipment Untrained personnel can perform basic ma...

Страница 13: ...iately reported to the carrier and a claim should be filed In the event a claim for shipping damage is filed the unit cardboard container and all packing must be kept for physical inspection by the fr...

Страница 14: ...provide proper pitch down from the supply end if the convector is being used in a two pipe steam system Upon installation make sure that all sweated connections have been flushed with system water to...

Страница 15: ...nting caulking etc All water coils must be protected from freezing after initial filling with water Even if the system is drained unit coils may still hold enough water to cause damage when exposed to...

Страница 16: ...mical process between two components such as epoxies and urethanes should be avoided All standard colors including primer can be painted over If the installing contractor chooses not to paint over the...

Страница 17: ...e conditions persist recheck the system for air that may not have been properly vented during start up Water treatment Proper water treatment is a specialized industry and therefore it is recommended...

Страница 18: ...ghly Failure to maintain a clean coil surface will result in reduced performance Inspect for leaks Replace front cover If a damper is included ensure that the damper is able to move freely Equipment s...

Страница 19: ...d the manufacturer s warranty When ordering parts the following information should be supplied to ensure proper part identification Complete unit model number Complete part description including any i...

Страница 20: ...Rittling 100 Rittling Boulevard Buffalo NY USA 14220 T 716 827 6510 F 716 827 6523 sales zehnder rittling com www zehnder rittling com Zehnder Rittling November 2013 English subject to change without...

Отзывы: