Zehnder Olga Electric
Concept House
Watchmoor Point
Camberley
Surrey GU15 3AD
Tel:
Fax: 01276 24058
[email protected]
www.zehnder.co.uk
Registered in England: 2296696
01276 605800
Zehnder Group UK Ltd
Issue 1.0
Key
Component
Qty
Tools & Material Required
Screwdriver - crosshead
Pliers
Electric drill
Masonry drill bit
Spirit level
Stepladder (for taller radiators)
A
Wall Plug
4
B
Bracket
4
C
Screw - Crosshead, 6.3mm dia x 60mm
4
D
Grub Screw
4
E
Allen Key
1
A
B
C
D
E
Assembly Instructions
Accurately mark out bracket holes on wall using spirit level.
Drill four 10mm dia holes to a minimum depth of 70mm & insert wall plugs (A).
Screw brackets (B) into wall plugs (A) with 6.3mm diameter x 60mm screws (C).
Offer radiator up to wall and slide square posts on the rear of the radiator into
brackets (B).
Secure radiator in position by tightening grub screw (D) with Allen key (E).
Electric radiators should be fitted only by a qualified electrician and must be
earthed and connected to a cable outlet in the bathroom in accordance with
I.E.E. wiring regulations. The electrical connection should be made to a ‘5 amp
fused fixed spur’ located outside the bathroom.
Note: for maintenance purposes, cable outlets must remain accessible and cables
must not be buried directly into walls.