5
INSTALLING THE FOOT RAIL
• Install the rail at the foot of the bed. You only need to slide the rods in the
“U” shaped clips. See the circle in the image below for more information.
Connecting your adjustable bed
• Plug the 110V wire cable in the wall outlet.
Installing your mattress
• Simply install the mattress on the bed.
SYNCHRONIZING TWO ZEDBED
ADJUSTABLE BED SYSTEMS
1. For two Zedbed systems that need to be synchronized, you will have two
adjustable bases of the same size each with their own respective wiring
components.
2. Position the two beds so that you may begin to connect the synchronization
cables together.
3. Under one of the two Zedbed systems you will notice that the remote
receiver cable is not connected, this is normal and important that
YOU DO
NOT CONNECT IT
if you have selected the synchronized option.
4. Connect both systems to your wall outlets. It is important that both systems
are connected in order to have full power for each system.
5. At any time your Zedbed systems can be unsynchronized, however it is
important to note you will require two separate mattresses.