![ZEAPON PS-E1 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/zeapon/ps-e1/ps-e1_user-manual_3237315005.webp)
5
Function Introduction
Function
Button Action
Beep
Power on
Press and hold the power
button for 3 s
/
Power off
Press and hold the power
button for 3 s
/
Left Rotation
Press and hold the left button
/
Right Rotation
Press and hold the right
button
/
Speed Adjustment
Click the power button once
/
Create the point
Double click the power
button twice
Creation point 1 ring once
Creation point 2 rings twice
Delete all points
Press and hold the left button
+ the right button
Rings long once
Start operation
Double click the power
button twice
/
Starts/Pauses circulation
Click the left/right
the power button
Rings once
Automatic left and
right/moving
Double-click left/right buttons
/
Note:
The vertical load of pan head is 4kg;
The horizontal load is 50 kg;
1.
Take out the rail slider connecting seat from the bottom of the pan head
2.
Install the pan head on the tripod
3.
Install the ball head on the pan head
4.
Install the quick-mount plate to the bottom of the device
5.
Install the device installed with the quick-mount plate on the pan head.