Solo documento principale.
Ident
ific
at
ion:
M
D
-AL
-GI
-00
R
ev
. 4
.0
of
31.
01.
18
-
Appl
ic
at
ion
: G
ID
Pile Reg. IT12110P00002965 -
Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481
– AR REA no. - 94189
Certified Company ISO 9001 - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
[email protected] - [email protected] -
zcsazzurro.com
Manual of 25/08/2020 Rev. 1.2 “User Manual 7000-BE-24”
25/43
5.
Mounting
5.1.
Wall mounting
1)
Identify the installation position and mark the two holes for the wall screws, which will be inserted
in the top rear of the charging station. You can use the hole jig found in the package.
2)
Drill two holes with the 6mm diameter drill bit and insert the plugs horizontally into the holes,
paying attention to the force and depth with which they are inserted (make sure the plug
completely enters the hole).
3)
Insert the two M4x32 screws into the wall plugs, allowing the heads of the screws to protrude by at
least 5 mm.
4)
Provisionally position the charging station by inserting the head of the screws into the upper holes
at the rear.
5)
Open the front of the charging station using the wrench provided.
6)
Mark the position of the third fastening screw. The hole is located at the bottom of the charging
station.
7)
Remove the station and make the third hole, inserting the wall plug.
8)
Reposition the station and secure the third screw at the bottom.
Figure 16 - Positioning of screws for wall mounting
M4×32
self-tapping screws
Φ6×35mm
expansion plugs