Solo documento principale.
Ident
ific
at
ion:
M
D
-AL
-GI
-00
R
ev
. 4
.0
of
31.
01.
18
-
Appl
ic
at
ion
: G
ID
Pile Reg. IT12110P00002965 -
Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481
– AR REA no. - 94189
Certified Company ISO 9001 - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
[email protected] - [email protected] -
zcsazzurro.com
Manual of 25/08/2020 Rev. 1.2 “User Manual 7000-BE-24”
18/43
12
Safety goggles
Protective clothing
Table 3 – Installation tools
3.2.
Installation process
3.2.1.
Installation position
Choose an appropriate installation location for the charging station. Follow the requirements below to
determine the installation position.
The installation location chosen should allow easy access to the charging station for normal operation
and maintenance.
For safety reasons, ZCS and/or its authorised partners may not perform repairs/maintenance or move
the chargers from and to the ground if they are installed at a height of more than 180 cm. Stations
installed at higher heights must be moved to the ground before they can be repaired or serviced.
3.2.2.
Movement of the charger
1)
Open the packaging and remove the polystyrene protection cover, insert your hands into the slots
and take hold of the device;
2)
Lift the charging station from its packing box and move it to the installation position, then remove
the polystyrene protections.
•
To prevent damage and personal injury, hold the device securely when
moving as it is a heavy piece of equipment
•
Always position the device horizontally
Attention