31
Installation
Unpacking
All transit bolts and packing must be removed
before using the appliance.
You are advised to keep all transit devices so
that they can be refitted if the machine ever
has to be transported again.
1. After removing all the packaging, carefully
lay machine on it’s back to remove the
polystyrene base from the bottom.
2. Remove the power supply cable and the
draining hose from the hose holders on the
rear of the appliance.
3. With a suitable spanner unscrew and
remove the central rear bolt
A
.
4. Unscrew and remove the two large rear
bolts
B
and the six smaller bolts
C
.
C
C
E
D
C
C
B
B
A
5. Remove the bracket
D
, refit the six smaller
bolts
C
and slide out the relevant plastic
spacer
E
.
6. Open the porthole, take out the inlet hose
from the drum and remove the polystyrene
block fitted on the door seal.
7. Fill the smaller upper hole and the two large
ones with the corresponding plastic plug
caps supplied in the bag containing the
instruction booklet.
Positioning and Levelling
Install the machine on a flat hard floor. Make
sure that air circulation around the machine is
not impeded by carpets, rugs etc. Check that
the machine does not touch the wall or other
kitchen units.
Level the washer-dryer by raising or lowering
the feet. The feet may be tight to adjust as they
incorporate a self locking nut, but the machine
MUST be level and stable.
Any necessary
adjustment can be
made with a spanner.
If necessary, check the
setting with a spirit
level.
Accurate levelling prevents vibration, noise and
displacement of the machine during operation.
Never place cardboard, wood or similar
materials under the machine to compensate for
any unevenness in the floor.
132963651.qxd 29/05/2008 14.56 Pagina 31