3.13 Final checks
Before delivering the truck to the customer, it is necessary to carry out the following checks:
Correct fixing of all the mechanical units
No air gaps between the unit and truck wall
Correct connection of the drain hoses
Correct installation of the diesel fuel pump
Correct connection of the diesel fuel pipes and the tightening
of fittings
Correct fixing of the battery
Battery connections in order
Correct closing of all covers and the electrical panel
Pre-start test run
Содержание UNO Series
Страница 48: ...INSTALLATION MANUAL Refrigeration unit Series Uno Undermount UN120 UN120 Multi 48 rev 02 4 3 1 Power board...
Страница 49: ...Refrigeration unit Series Uno Undermount UN120 UN120 Multi INSTALLATION MANUAL rev 02 49 4 3 2 Electronic board...
Страница 54: ...INSTALLATION MANUAL Refrigeration unit Series Uno Undermount UN120 UN120 Multi 54 rev 02 4 4 1 Power board...
Страница 56: ...INSTALLATION MANUAL Refrigeration unit Series Uno Undermount UN120 UN120 Multi 56 rev 02 4 4 3 Electronic board...