
22
Straddle version with try of evaporation water of condenses:
Before mounting the unit prepare the cuts and holes in the cold room wall shown in the picture.
Fix the unit in place with the appropriate screws (Fig.3).
To execute the connection between the
drainage of the small basin evaporator and vaschetta the evaporation water of condenses (Fig.2), using the tube
supplied with the unit.
A
B
C
D
E
mm
mm
mm
mm
mm
ZM1
223
300
366
55
40
ZM2
362
300
644
55
40
ZM3
263
435
634
65
45
ZM3
P
362
300
644
55
40
Fig.2
Fig.3
Drainage water
of condenses Ø
14mm
Fig.1