Installation
HDK350_EN_01_2005-05-10
31
For operation monitoring system (optional)
Operators have the option to connect the dryer to a fault signalling system,
connecting the respective line to a potential-free operation signalling contact.
With this option, the following statuses and events can for example be
transmitted to a remote control room:
Dryer on (contact made)
Power supply disconnected (no contact)
Dewpoint alarm (only with
dewpoint-sensing control
option, no contact)
To install the external lines, proceed as follows:
►
Connect the lines of the fault signalling system to relay K5 (see circuit
diagram).
Check bolt connections
Before the initial start-up:
►
Check all unions and bolt connections as well as the terminals in the control
cabinet for secure seating; re-tighten if necessary.
Содержание HDK 140/100
Страница 1: ...High Pressure Dryer HDK 50 100 600 350 Operating Instructions Issue 05 2005 EN ...
Страница 3: ......
Страница 4: ......
Страница 6: ......
Страница 68: ...Logic control diagram 68 HDK350_EN_01_2005 05 10 Logic control diagram Adsorption in B1 and regeneration in B2 ...
Страница 69: ...Annex with technical documentation HDK350_EN_01_2005 05 10 69 Regeneration in B1 and adsorption in B2 ...
Страница 72: ...Dimensional drawing 72 HDK350_EN_01_2005 05 10 Items Option ...