Zamel EXTA APM-20 Скачать руководство пользователя страница 2

CONNECTION

FUNCTIONIG

WARRANTY CARD

There is a 24-month guarantee on the product

Salesman stamp and signature, date of sale 

MOUNTING

1. Disconnect power supply by the phase 

fuse,  the  circuit-breaker  or  the  switch-

-disconnector combined to the proper 

circuit.

2. Check if there is no voltage on connec-

tion cables by means of a special me-

asure equipment. 

3. Mount the APM-20 device on the TH35 

rail.

4. Connect the cables with the terminals in 

accordance with the installing diagram.

5. Switch  on  the  power  supply  from  the 

mains.

6. Check if the device operates correctly.

1.  ZAMEL Sp. z o.o. assures a 24-month guarantee for the product.

2.  The manufacturer’s guarantee does not cover any of the following actions:

a)  mechanical damage during transport, loading / unloading or under other circumstances,

b)  damage caused by incorrect product mounting or misuse,

c)  damage caused by unauthorised modifications made by the PURCHASER or any third parties to the product or any other 

devices required for the product functioning,

d)  damage caused by Act of God or any other incidents independent of the manufacturer – ZAMEL Sp z o.o.

e)  supply sources (batteries) included in the device during selling (if they are included).

3.  The PURCHASER shall lay any claims in writing in the place of purchase or to ZAMEL Sp. z o.o.

4.  ZAMEL Sp. z o.o. is liable for processing any claim according to current Polish legislation.

5.  ZAMEL Sp. z o.o. shall process the claim at its own discretion: product repair, replacement or money return.

6.  The manufacturer’s guarantee is valid in the Republic of Poland.

7.  The PURCHASER’s statutory rights in any applicable legislation whether against the retailer arising from the purchase contract or 

otherwise are not affected by this warranty.

The device is designed for single-pha-

se installation and must be installed 

in  accordance  with  standards  valid  in 

a particular country. Installation, con-

nection and control should be carried 

out by a qualified electrician staff, who 

act  in  accordance  with  the  instruction 

manual and the device functions. In 

case of casing dismantling, the guaran-

tee is lost and an electric shock may 

occur. Before installation make sure 

the connection cables are not under 

voltage. The cruciform head screwdri-

ver 3,5 mm should be used to install 

the device. Improper transport, stora-

ge, and use of the device influence its 

wrong  functioning.  It  is  not  advisable 

to  install  the  device  in  the  following 

cases: if any device part is missing 

or the device is damaged or defor-

med. In case of improper functioning 

of the device contact the producer.

CAUTION

CASING DIMENSIONS

After power supply is applied, the device is ready to operate. If the voltage on the L1 phase 

is higher than 180 V AC, then the receiver is supplied from another phase. If the voltage on 

the L1 drops below 180 V AC, then there is an automatic switch to the L2 phase in <150 

ms. Analogically, if the L2 phase voltage drops below 180 V AC, then there is an automatic 

switch to the L3 phase. In case the L3 phase voltage is below 180 V AC, there is a power 

supply switch off for the receiver connected to this output. If the given phase is switched off 

due to a voltage drop of <180 V AC, then it is switched on again at a value of >190 V AC 

(hysteresis 10 V). The L1 is the priority phase. In case its parameters are correct, then this 

phase will supply the receiver. For example, if a receiver is supplied by the L3 phase and, at 

the same time, the L1 has correct parameters again, then an automatic switch to the L1 pha-

se supply will occur. If the voltage on a particular phase is >180 V AC, the appropriate LED 

switches on. This LED switches off if voltage drops below 180 V AC. The phase switching 

on and switching off times are the same and equals about 150 ms.

Operation – time diagram:

Internal connection arrangement – PK1, PK2, PK3 relays:

L1

L2

L3
N

L2

L3

OUT

OUT 

OFF

OUT 

OFF

L1

PK1

PK2

PK3

L1

L2

L2

L3

L3

L1

180 V AC

180 V AC

180 V AC

180 V AC

190 V AC

190 V AC

190 V AC

150 ms

Отзывы: