background image

 

c)

 

Put the main body part into the hanging panel, keep the bottom line horizontally aligning with location hole; 

pull down to fix it.     

 

 

3. Screw Fixing   

a)

 

Take  out  the  tapered  screws  and  expansion  tube  from  PE  bag,  and  then  take  down  the  hanging  panels  of 

door contact main body and magnet separately. 

b)

 

Make  location  holes  by  scribing  lines  on  fixed  or  movable  door/window  in  parallel,  keep  the  distance  of 

main body and magnet≤6mm.If on the wooden wall, twist the screws directly; while on the concrete wall, 

use an electric drill to make aФ6MM hole, then insert the expansion tube into the hole. 

c)

 

Make  the  smooth  sides  of  hanging  panels  against  the  wall,  and  align  the  holes  of  hanging  panels  & 

expansion tube; then twisting screws with cross screwdriver. 

 

Отзывы: