10
II. Installing the Chamber Handle to the Lid
1. Lift the Grill Body Assembly (1), and place on the floor with wheels on the floor. CAUTION: Grill is heavy
and requires two people to lift.
2. Raise the Grill Body Assembly (1) lid and align the holes of the handle with the lid.
3. Insert Bolts (H) through Washers (D) and then through the lid and into the Handle (9)t
4. Bolts (H) into Handle (9) with Wrench (B).
Содержание ZPG-550B
Страница 1: ...550B...
Страница 3: ...SAVE THIS MANUAL FOR FUTURE REFERENCE...
Страница 4: ...3 WARNINGS...
Страница 6: ...5 PARTS DIAGRAM ASSEMBLY INSTRUCTIONS...
Страница 7: ...6 Hoppe Burner Assembly...
Страница 13: ...12 IV Installing the heat baffle 1 Place the lower bracket of the Heat Baffle 6 into the groove of the feeder...
Страница 22: ...21 DIGTAL THERMOSTAT CONTROL WIRING DIAGRAM...