YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, PA • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
NJEX ZEO Version 04/13/2021
Page 7
Warranty
Please visit our web site www.yzsystems.com for a complete copy of our warranty contained in
our Terms and Agreement document.
SAFETY NOTES
– General System
• Always use extreme care when performing maintenance on an odorization system. Check to
ensure the removal of liquid odorant and pressure from the portion of the system on which work
will be performed prior to removing components or fittings.
• Inspect all tube fittings and valve packing semiannually to ensure that liquid odorant remains
within the system.
• Systems must be installed per local electrical codes for which it is located.
• All mechanical and electrical work on NJEX ZEO Systems must be performed by trained
professionals.
• Proper personal protection equipment (PPE) such as protective eyewear and gloves should be
worn while installing or servicing this equipment.
WARNING: POTENTIAL STATIC CHARGING HAZARD - To avoid static buildup, use a
damp cloth to clean all painted or other non-metallic surfaces.
WARNING: MATERIALS USED IN THE CONSTRUCTION OF GROUP II ENCLOSURES
FOR EPL Ga EXCEEDS 10% IN TOTAL OF ALUMINUM, MAGNESIUM, TITANIUM AND
ZIRCONIUM
– Non-sparking tools must be used while servicing the ZEO System and N-
400 controller to avoid an ignition hazard due to impact or friction.
WARNING: Power must be disconnected or locked out from the NJEX ZEO system before
performing any troubleshooting or repair to electrical components.
CAUTION: Vent Valve must be closed in all operations excluding venting. Failure to close
V5 during other operations will result in spilled odorant.
Содержание NJEX ZEO 6400
Страница 1: ...The NJEX ZEO 6400 7400 8400 9400 Instruction Operating Manual ZERO EMISSIONS ODORIZATION SYSTEM ...
Страница 2: ......
Страница 4: ......