
YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720
Page 78
NJEX 7300L ver.09042003
SSSSS
ECTION
ECTION
ECTION
ECTION
ECTION
12:
12:
12:
12:
12: S
S
S
S
S
Y
YY
Y
YSTEM
STEM
STEM
STEM
STEM
M
M
M
M
M
AINTEN
AINTEN
AINTEN
AINTEN
AINTENANCE
ANCE
ANCE
ANCE
ANCE
Filling the Verometer
Figure 230
Refer to the Filling the Verometer Operational Sche-
matic figure 230, on page 79.
1. Close valve V2, V3, and V5
2. Open valve V4 until gauge reads 25 psi (1.72 Bar)
and then close V4.
3. Open valve V17
4. Place the NJEX System in Standby mode by
pressing the Standby key on the front of the N-300
controller. The Standby LED indicator will begin to
flash on and off.
5. Scroll to the Meter Level display on the N-300
controller and select *Fill.
6. Press Standby key to reactivate normal operation.
The Verometer will begin to fill.
Содержание NJEX 7300L
Страница 1: ...NJEX 7300L L P G O D O R I Z A T I O N S Y S T E M...
Страница 2: ......
Страница 3: ...THE NJEX 7300L INSTRUCTION OPERATING MANUAL Version NJEX7300L 10012003...
Страница 4: ......