
YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720
Page 80
NJEX 7300L ver.09042003
SSSSS
ECTION
ECTION
ECTION
ECTION
ECTION
12:
12:
12:
12:
12: S
S
S
S
S
Y
YY
Y
YSTEM
STEM
STEM
STEM
STEM
M
M
M
M
M
AINTEN
AINTEN
AINTEN
AINTEN
AINTENANCE
ANCE
ANCE
ANCE
ANCE
Priming & Starting the NJEX
System
Figure 231
1. Verify that the system is in the “Idle” mode on on the
mmain display. If it is not follow steps to stop
operation found in Section 11.
2. Place unit in the Standby mode by pressing the
Standby key located on the front of the N-300
controller. The Standby LED will begin the flash on
and off.
3.
Verify that valve V8 is closed.
4.
Open valve V3
5. Press Standby key to reactivate normal operation.
6. Manually stroke the pump 15-20 times.
7.
Close valve V3
8.
Open valve V8
9.
Select *Start from the main N-300 controller menu,
and follow N-300 instructions to start the system
found in Section 11.
Содержание NJEX 7300L
Страница 1: ...NJEX 7300L L P G O D O R I Z A T I O N S Y S T E M...
Страница 2: ......
Страница 3: ...THE NJEX 7300L INSTRUCTION OPERATING MANUAL Version NJEX7300L 10012003...
Страница 4: ......