
YURAKU PTE LTD
11 Collyer Quay
#10-04 The Arcade
Singapore 049317
www.yuraku.com.sg
5.5 Module Terminations
5.5 Module Terminations
5.5 Module Terminations
5.5 Module Terminations
•
A junction box as a terminal enclosure is equipped for electrical connections on YURAKU
modules.
•
If two or more separable connectors are provided, they shall be configured or arranged
so that the other and vice-versa will not accept the mating connector for one, if it will
result in an improper connection.
5.6 Conduit
5.6 Conduit
5.6 Conduit
5.6 Conduit
•
For applications where wire conduits are used, follow the applicable codes for outdoor
installation of wires in conduits. Minimum diameter of wire conduit is 4.0 mm
2
.
•
Verify that all fittings are properly installed to protect wires against damage and prevent
moisture intrusion
6.0 Module Mounting
6.0 Module Mounting
6.0 Module Mounting
6.0 Module Mounting
The YURAKU Limited Warranty for PV Modules is contingent upon modules being mounted in
accordance with the requirements described in this section.
6.1 Site Considerations
6.1 Site Considerations
6.1 Site Considerations
6.1 Site Considerations
YURAKU modules should be mounted in locations that meet the following requirements:
Operating Temperature:
All YURAKU modules must be mounted in environments that ensure YURAKU modules will
operate within the following maximum and minimum operating temperatures:
Max. Operating Temp. +85°C, +185°F
Min. Operating Temp. -40°C, -40°F
Care should be taken to provide adequate ventilation behind the modules, especially in hot
environments.