![Yunca Gas MULTI FUEL ZERO CLEARANCE INBUILT Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/yunca-gas/multi-fuel-zero-clearance-inbuilt/multi-fuel-zero-clearance-inbuilt_user-manual_915843003.webp)
ASSEMBLY INSTRUCTIONS
PANEL ASSEMBLY
N.B. All fixing is by No 8 x 12
screws
Fascia and side panels to be
assembled together on a flat base,
where panels cannot be damaged.
(e.g. on carpet)
Fix panels 1 to 2, 3 & 4. Check
alignment before tightening screws.
Clip top of fascia panel over top
removable panel (see inset A) and
screw into place at bottom. Align
panels to main door before
tightening screws. Check opening
doors clear left side panel. NOTE:
Panels to be fitted after installation
to avoid damage.
1. Backing Panels (x 2)
2. Top Fascia Panel
3. LH Side Panel
4. RH Side Panel
5. Top Grill
6. Clip On Bottom Grill
7. Removable Top Panel
Note: Ensure top and bottom
Control slides open and close
fully
SEISMIC RESTRAINT
HEATER COWL MUST
BE BOLTED DOWN ON
TO THE HEARTH SLAB.
1
2
3
4
5
6
7
2
7
Insert A
Содержание MULTI FUEL ZERO CLEARANCE INBUILT
Страница 2: ......
Страница 4: ...TYPICAL FLUE INSTALLATION ...