![Yuchai YC08-8 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/yuchai/yc08-8/yc08-8_operation-and-maintenance-manual_3661975026.webp)
2-12
Before turning on the engine please do check the working area’s situation as following
1: Slopes’s position
2: Channel
3: Fallen things and Hanging things
4: Seeper and Swamp
5: Rock and Stump
6: Buried groundwork, pillar and verge of
the wall.
7: Buried rubbish and verge of the filling
8: Hole of ground, impediment and Ice or earth
9: traffic
10: Dust, thick smoker, thick fog.
11: make sure the exact position of Buried line of electricity, gas, phone, water an other
communal Establishment. It’s necessary to ask the company remove or close those establishment
whom own this.
Warning: Please contact the local public establishment department and
system
12: when working in the building please make clear the top of area , aisle and passage. And
ensure the Floor can hold the machine. Operate the machine in the house please make sure
there have enough fresh air. The unknown things might hurt you.
13: Please find the exact Distance between machine and wire, line. It’d better cut off the power
. If there could not cut off the power, please follow the guiding.
Warning: Touching electrical power line may will cause short circuit, so
keep a safe distance between the machine and electrical line power.
Unless the protection is already done.. Please pay attention.
14: Make sure keep the legal distance between machine and gas line, wire line, phone line.
Warning : Do not watch inside of broken optical fiber. It might hurt your
eye badly
15. The machine is prohibited to work in the culvert, underground.
16. The machine is prohibited to work in chemical of hazardous material area.
17. The machine is prohibited to use in places with explosion danger.
Safte of Work Area
Содержание YC08-8
Страница 1: ......
Страница 2: ......
Страница 6: ......
Страница 7: ...Guangxi Yuchai Heavy Industry Co Ltd ...
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 12: ...YC08 8 kg m kw min 1 mm mm mm mm mm mm mm mm mm mm mm km h rpm 3 A B C D E F G H J L ...
Страница 13: ......
Страница 14: ...0 02 1 5 2 7 7 8 17 36 ...
Страница 15: ......
Страница 16: ......
Страница 18: ......
Страница 37: ...2 23 3 When the machine dumpages the operator must fist the handrail or the pillar of the cab do not jump off ...
Страница 39: ......
Страница 40: ...Battery ...
Страница 43: ......
Страница 44: ...5 3 U kml Ogmkh n mchg ...
Страница 48: ... l u22 2 w 31 y5y1 G R N R UR UN__V_ P Z X XRbR Rd RZQNOXR UR PUN__V_0 kx 423 3 y w u22 2 ...
Страница 54: ...5 33 m1 5y1h2 2yu3 ...
Страница 56: ...5 2 n 6K M ODIB BPD ...
Страница 74: ...714 2 BDK C m CHI7AA C J9 I ...
Страница 76: ...z I G DE G7I DC 7154 ...
Страница 80: ...7158 ...
Страница 81: ...7159 0E G7I C JG G I DA r DI L 7I G ...
Страница 83: ...715 ...
Страница 84: ...4 29 Technical problem causes and solve step ...
Страница 85: ...4 30 ...
Страница 86: ...4 31 ...
Страница 87: ...4 32 ...
Страница 88: ...4 33 ...
Страница 89: ...4 34 ...
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 95: ... 0 B57 5 3 9 9 3BD ...
Страница 98: ... 3 ...
Страница 99: ...4 0 ...
Страница 101: ...fV YX d dY dacbeY aZ Xa YXd Wa_d 4 01 ...
Страница 103: ...4 03 tkq ...
Страница 105: ...4 05 ...
Страница 106: ...4 06 ...
Страница 107: ...4 07 ...
Страница 111: ... Y 0wzy31 ...
Страница 122: ......
Страница 125: ......
Страница 127: ......
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......