YUANLEY 10 Port 10/100/1000Mbps PoE Switch Скачать руководство пользователя страница 14

5 .Installation platform:

No matter it is installed in the rack or other horizontal workbench, please pay attention to the below:

Confirm the rack or workbench with good stability;

Confirm the good cooling system of the rack, or keep the good ventilation indoor;

Confirm the rack with good grounding, keep the distance between the switch and 
power outlet less than 1.5 meter.

4 .Demand for Lightning Protection

It will cause the fatal damage to the electronic device by the split-second powerful current when the 
lightning occurs. To achieve the better effect of lightning protection, please pay attention to the below:

Confirm the rack with good grounding;
Confirm the power outlet with good grounding;
Reasonable wiring to avoid lightning internal induction;
Recommend usage of signal lightning arrester when wiring outdoor

4.Installation for Products

1

2

3

1). Instruction for front hangers

Please use the front hangers to fix the switch when install the switch to the cabinet or above the cabinet. 
The appearance of the front hangers are as shown in illustration 2-1

Illustration 2-1

Screw holes for hangers and cabinets

Screw holes for hangers and cabinets

Matched screws (to fix the hangers to the switch)

3). Install the switch to the cabinet

Please guarantee there are about 50mm space between the cabinets for the device 
to radiate when installing the switch to the cabinet. Please use the standard hangers
to install the switch to the cabinet, the process is as follows.

Step 1: Take out the screws (matched hangers), install the hangers to the switch, as shown 
in illustration 3-1

!

Illustration 2-2

2). Introduction for Mats

 A set contains 4pcs mats, as shown in illustration 2-2. Please install 4pcs mats to the bottom of 

the switch before install the switch on the platform.

Mats

Illustration 3-1

12

Отзывы: