background image

youngmangroup.com

Collapsing the Tower

Warning 

The platform must ALWAYS be removed prior to collapsing the Tower.

1. Remove any tools or other items that are on the platform.
2. Remove the Toe board from the platform.
3. Unfasten the four Platform Stabilisers and stow under the platform as described
on page 15.
4. Unfasten the two spring-catches that hold the platform to 

RUNG 3

.

5. Carefully lift the Platform off  each 

RUNG 3

 and take the Platform to a safe place

away from the Tower.

Warning 

Always begin collapsing Tower assembly by starting from RUNG 7.

Remember 

The red and yellow buttons operate as follows:
• The buttons on 

RUNG 7

 release the locking mechanism for 

RUNG 6

  which  allows   

   

RUNG 6

 and all above to move down .

• The buttons on 

RUNG 6

 release the locking mechanism for 

RUNG 5

  which  allows   

   

RUNG 5

 and all above to move down.

• The buttons on 

RUNG 5

 release the locking mechanism for 

RUNG 4

 which allows 

   

RUNG 4

 and all above to move down.

• The buttons on 

RUNG 4

 release the locking mechanism for 

RUNG 3

  which  allows   

   

RUNG 3

 and all above to move down.

• The buttons on 

RUNG 3

 release the locking mechanism for 

RUNG 2

 which allows  

   

RUNG 2

 and all above to move down.

• The buttons on 

RUNG 2

 release the locking mechanism for 

RUNG 1

 which allows  

   

RUNG 1 

to move down.

26

Содержание TTA02

Страница 1: ...red in aluminium with an anodised finish It is built to withstand the toughest handling and working conditions Suitable for home and commercial use Spare parts are readily available We recommend you t...

Страница 2: ...rs 6 Deploying the ground stabiliser legs 7 Step 1 Erecting the Safety Cage 8 Step 2 Fitting the Platform 11 Step 3 Fitting the Toeboards 13 Step 4 Deploying the Platform Stabalisers 14 Step 5 Setting...

Страница 3: ...eed the maximum load of 150 kg It is recommended that the platform is removed when adjusting the Tower It is recommended that the platform is removed when collapsing the Tower Never release two red bu...

Страница 4: ...s a Tower or a Podium Has seven working height from 0 33m to 2m Five position stabiliser legs with locking castors Can be erected in less than three minutes by a single person thereby saving down time...

Страница 5: ...s Supplied There are four models of the Tower TTA02 TTA02TB TTG02 and TTG02TB The illustrations below apply to model TTA02TB where TB indicates toe boards are supplied 1 The main assembly in collapsed...

Страница 6: ...5 RUNG 6 and RUNG 7 When a button is activated by sliding it away from the end of the rung the locking pin at this position is retracted which allows the rung immediately above and any rungs and or st...

Страница 7: ...castors and return the Tower to its upright position Deploying the Ground Stabiliser Legs The ground stabiliser legs should be deployed when the Tower has been fully erected at the required platform h...

Страница 8: ...push the front legs slightly apart as shown in Figure 1 2 4 Lift and withdraw the folded platform and put it to one side 5 Unfold the Tower and straighten the yellow gate keeping the side frames paral...

Страница 9: ...n the opposite frame of the Tower Note There is a pair of hand rails and a pair of knee rails on the left and right frames of the Tower The lower part of each pair comprises a side rail RUNG 1 and RUN...

Страница 10: ...e 4 Extend the rail until you hear two clicks This tells you that the 3 part rail has been securely locked in its extended position Carefully let the rail hang down from the attached end Note You shou...

Страница 11: ...G 3 except when the TELETOWER is being used in PODIUM mode 1 Fully unfold the platform until it is straight It will lock straight automatically Ensure it has locked in this position see Figure 2 1 2 T...

Страница 12: ...he platform has two spring loaded safety catches located one at each end on the underside which when set secures the platform to RUNG 3 see Figure 2 4 Pull the tab onto the locking pin on each RUNG 3...

Страница 13: ...the receptacles from above and lower it into place Figure 3 1 2 Repeat for the other three sections with pins 3 Take a side Toe board and align the lugs with the slots in the front rear toe boards se...

Страница 14: ...the inner face of RUNGS 5 6 7 The stabilisers are telescopic in construction and adjustable to three different lengths to suit the three platform heights that require platform stabilisers to be used T...

Страница 15: ...1 75 metres The correct bracket is always two rungs below the platform Firmly push the stabiliser end onto the bracket Check that it has locked Repeat for the other three stabilisers Releasing the Sta...

Страница 16: ...e Tower Warning When you wish to change from one platform height to another you are recommended to remove the platform lower the Tower until the platform height is at 1 00 metre and then follow the pr...

Страница 17: ...e Platform to RUNG 3 as described on page 11 and 12 3 Fit the Toe boards as described on page 13 4 Deploy the ground stabiliser legs as described on page 7 PLATFORM TOE BOARD LOCKING GATE RUNG 9 RUNG...

Страница 18: ...form to RUNG 3 as described on pages 11 and 12 4 Fit the Toe boards as described on page 13 5 Deploy the ground stabiliser legs as described on page 7 Step 5 Setting the Platform Height RUNG 3 RUNG 4...

Страница 19: ...RUNG 6 on the LEFT frame until locked 6 Attach the Platform to RUNG 3 as described on pages 11 and 12 7 See Deploying the Platform Stabilisers described on pages 14 and 15 Extend and lock a platform...

Страница 20: ...t 1 50 Metres RUNG 3 RUNG 3 RUNG 4 RUNG 4 RUNG 5 LIFT RUNG 5 RUNG 6 RUNG 7 RUNG 7 RUNG 1 RUNG 2 LIFT RUNG 6 Click Click Click Click LOCKED LOCKED LOCKED LOCKED LOCKING GATE LOCKING GATE RUNG 9 RUNG 9...

Страница 21: ...ft RUNG 6 on the RIGHT frame until locked 8 Attach the Platform to RUNG 3 as described on pages 11 and 12 9 See Fitting the Platform Stabilisers described on pages 14 and 15 10 Extend and lock a platf...

Страница 22: ...eight RUNG 2 RUNG 2 RUNG 1 RUNG 1 RUNG 3 RUNG 4 RUNG 6 RUNG 7 RUNG 3 RUNG 4 RUNG 5 RUNG 7 LIFT RUNG 6 Click LOCKED LOCKED LOCKED LOCKED LOCKING GATE RUNG 9 RUNG 8 LOCKING GATE RUNG 9 RUNG 8 LIFT RUNG...

Страница 23: ...ked 8 Place your foot on RUNG 9 and lift RUNG 6 on the RIGHT frame until locked 9 Place your foot on RUNG 9 and lift RUNG 6 on the LEFT frame until locked 10 Attach the Platform to RUNG 3 as described...

Страница 24: ...RUNG 8 LOCKING GATE RUNG 9 RUNG 8 LIFT RUNG 3 LOCKED LOCKED Click Click LIFT RUNG 4 Click LOCKED LOCKED Click RUNG 1 R RUNG 1 RUNG 2 R R RU RUNG 3 RUNG 2 R R RUNG 4 RUNG 5 RUNG 6 RUNG 7 RUNG 5 RUNG 6...

Страница 25: ...G 6 Click Click LOCKED LOCKED RUNG 1 RUNG 1 RUNG 2 RUNG 7 RUNG 4 RUNG 4 RUNG 3 RUNG 3 RUNG 2 RUNG 5 RUNG 6 RUNG 7 RUNG 9 RUNG 8 LOCKED LOCKED LOCKING GATE LOCKING GATE youngmangroup com 25 Step 5 Sett...

Страница 26: ...starting from RUNG 7 Remember The red and yellow buttons operate as follows The buttons on RUNG 7 release the locking mechanism for RUNG 6 which allows RUNG 6 and all above to move down The buttons o...

Страница 27: ...tep 1 a to c on the right frame ARNING NEVER release the two buttons on a rung at the same time ARNING NEVER place your hand or fingers on rungs that are being wered onto another rung or on the rung y...

Страница 28: ...describes erecting the Safety Cage With the Safety Cage collapsed Step 6 Repeat as above for rung 2 but release buttons on RUNG 3 Step 7 On the right frame a With one hand hold RUNG 1 on the left fram...

Страница 29: ...n placing the platform location brackets on either RUNG 8 or RUNG 9 according to the podium height required 7 Fully unfold the platform until it is straight It will lock straight automatically Ensure...

Страница 30: ...the rail until you hear two clicks This tells you that the 3 part rail has been securely locked in its extended position Carefully let the rail hang down and rest on the platform 8 Repeat steps 4 to...

Страница 31: ...astors and stabiliser legs are secure and locked before using the Podium In use To step onto the Podium 1 Release the front hand rail and the front knee rail 2 Take care and step up onto the platform...

Страница 32: ...height Overall h x w x d m Erected Platform height 2 00m 2 94 x 1 5 x 0 92 m Erected Platform height 1 75m 2 69 x 1 5 x 0 92 m Erected Platform height 1 50m 2 44 x 1 5 x 0 92 m Erected Platform height...

Страница 33: ...repair or assessment against a warranty claim on any or component Materials and or labour costs to renew repair or replace components due to fair wear and tear Faults arising from the use of non stan...

Страница 34: ...5 23 22 20 19 27 17 18 1 15 16 6 5 13 29 7 1 Front rear hand rails 2 Guard rail latch 3 Spring loaded lock release button yellow 4 Front and rear toe boards short 5 Side toe board 6 Front and rear toe...

Страница 35: ...35 youngmangroup com Notes...

Страница 36: ...youngmangroup com Youngman Group Ltd The Causeway Maldon Essex CM9 4LJ United Kingdom t 44 0 1621 745900 e sales youngmangroup com...

Отзывы: