Safety First
Preparation and inspection
Safe use
Lifting of equipment
Inspect the equipment before use to ensure that it is not damaged
and that it functions properly. Damaged or incorrect components
should not be used.
●
Check that all components are onsite, undamaged and that
they are functioning correctly, refer to Checklist and Quantity
Schedules. Damaged or incorrect components should not be
used.
●
Check if the ground on which the mobile access tower is to be
erected and moved is capable of supporting the tower.
●
Towers must be climbed from the inside during assembly and
use. It is recommended that towers should be tied to a solid
structure when left unattended.
●
Tower components should be lifted using a reliable lifting
material (e.g. strong rope) employing a reliable knot (e.g. clove
hitch) to ensure safe fastening and always lift within the footprint
of the tower.
●
Assembled mobile towers should not be lifted with a crane or
other lifting device.
YOUNGMAN FIT-OUT MASTER
User Guide
3
Содержание FIT-OUT MASTER
Страница 1: ...Mobile Aluminium Trade Quality Access Tower System 3T Through the Trapdoor Method USER GUIDE ...
Страница 9: ......
Страница 19: ...YOUNGMAN FIT OUT MASTER User Guide 18 Notes ...
Страница 20: ...YOUNGMAN CO IN 19 Notes ...