background image

86(5*8,'(

(GLWLRQ$XJXVW

2QH0DQ$OXPLQLXP7RZHU

(1

(1,0(1

7

7KURXJKWKH7UDS'RRU

%R6662/2

Содержание boss solo 700

Страница 1: ...86 5 8 GLWLRQ XJXVW 2QH 0DQ OXPLQLXP 7RZHU 1 1 0 1 7 7KURXJK WKH 7UDS RRU R66 62 2 ...

Страница 2: ... R66 62 2 RQWHQWV 6DIHW LUVW RPSRQHQW LDJUDP 4XDQWLW 6FKHGXOHV 6WDEDOLVHUV XLOG 0HWKRG ...

Страница 3: ...ation work or short term access the highly versatile towers provide a strong working platform at a variety of heights The law requires that personnel erecting dismantling altering or inspecting towers must be competent Any person erecting the product described in this user guide must have a copy of this guide For further information on the use of mobile access and working towers consult the PASMA ...

Страница 4: ...be lifted or suspended Youngman Group strongly advises against the mixing of tower components because of the potential safety risks for users and their inability to rely upon the manufacturers Product Liability Insurance in the event of an accident occurring as a result of mixing components from different manufacturers For more information visit www youngmangroup com about mix match components It ...

Страница 5: ...adjust the legs as required Do not move the tower in wind speeds over 7 7 metres per second 17mph 0 17 1 1 6725 75 163257 All components and their parts should be regularly inspected to identify damage particularly to joints Lost or broken parts should be replaced and any tubing with indentation greater than 5mm should not be used and put to one side for repair by the manufacturer Adjustable leg t...

Страница 6: ...rce Walking is difficult 8 39 46 17 21 Excessive side loads from working on the tower i e through drilling or pulling may also make a tower unstable The maximum allowable side load on a tower is 20kg Do not abuse equipment Damaged incorrect or incompatible compents should not be used 85 1 66 0 86 1 60 17 1 6DIHW LUVW 35 3 5 7 21 1 163 7 21 Inspect the equipment before use to ensure that it is not d...

Страница 7: ...ind forces will almost certainly affect stability In these circumstances ensure that the tower is adequately tied in or restrained from blowing over and that the platforms are securely fixed or alternatively the tower dismantled For further information on tying in a tower consult the PASMA Technical Safety Guidance Note Tying Mobile Access Towers www youngmangroup com products access towers 6DIHW L...

Страница 8: ... R66 62 2 6DIHW LUVW 1mENDFRAME CAM LOCK GUARDRAILFRAME FOLDINGALUMINIUM TOEBOARDSET ASSEMBLYBRACKET 1 3mTRAPDOORDECK SP4STABILISER HORIZONTALBRACE ADJUSTABLELEG ANDCASTOR FOLDINGBASEUNIT ...

Страница 9: ......

Страница 10: ...ill need to be added if any levels are used as working platforms or for storage of materials This tower system has been developed in accordance with EN1004 for single person use If the tower is to be used with two people SP10 s stabaliser must be fitted in place of SP4 stabalisers 180 5 2 25 1 3 7 2506 2 BoSS Solo 700 1 3m x 0 7m 3T Method Internal or external use Working Height m Component Platfor...

Страница 11: ...ully extended Position the lower clamp so that the lower arm is as close to horizontal as possible Adjust the position of the top clamp to ensure the stabiliser foot is in contact with the ground Ensure clamps are secure When moving the tower adjust the top clamps or the telescopic leg to lift the four stabiliser feet a maximum of 25mm off the ground and then unlock the castor brakes After moving ...

Страница 12: ...ng of a tower If your risk assessment shows it necessary you may also need to guardrail platforms at this level The procedure illustrated shows a 6 2m working height tower The BoSS SOLO 700 system has been developed so that a single person can safely build the tower to a platform height of 4 2m Insert castor into adjustable leg apply brake by pushing the lever down release frame interlock clips an...

Страница 13: ...rame Ensure both hinges positively lock into position Engage brakes on second frame Locate the horizontal brace on the lowest rung with the hooks facing downwards check the brace is correctly locked on the tube at both ends Check the base unit is square and level using a spirit level Adjust legs only to level and not to gain additional height ...

Страница 14: ......

Страница 15: ... Lock Guardrail units on the front Assembly Bracket and then 1 x Folding Toeboard Place the last Cam Lock Guardrail on the end frame Assembly Bracket No 2 Then hang two pairs of connected 4 rung frames on the end bracket No 2 then hang the second trapdoor deck on the bracket 2xGUARDRAIL FRAMES 1xGUARDRAILFRAME 2x21mENDFRAMES 1x1 3mDECK 1xFOLDING TOEBOARD 2xGUARDRAIL FRAMES WARNING ASSEMBLY BRACKET...

Страница 16: ......

Страница 17: ...to engage the locking clips Add a Cam Lock Guardrail to rungs 13 15 and lock Remove the end frame assembly bracket from rung 10 of the end frame and re position on the top Cam Lock Position the folding toe board set and then the remaining two camlock frames on the uppermost bracket ...

Страница 18: ... 62 2 XLOG 0HWKRG Place the trap door deck onto the 16th rung of the tower and engage windlocks Climb the end frame from within and from the protected trap door position fit the Cam Lock Guardrails as shown ...

Страница 19: ... unfold and fit the toeboard into position on the working platform Move Assembly Brackets to base of the tower and fit to the lowest rungs of the end frames 7R LVPDQWOH D RVV 7RZHU Simply follow the assembly steps in reverse ensuring that the 3T method is followed XLOG 0HWKRG ...

Страница 20: ... R66 62 2 XLOG 0HWKRG 6WRUDJH 7UROOH VVHPEO Assemble the folding base frame with 1 trap door deck placed on the bottom rung forming the base of the trolley Lower all adjustable legs as far as possible ...

Страница 21: ...folding toeboard set to the trap door deck Position the 1 3m horizontal brace on the front upright just above the 4th rung Place the assembly brackets one at each end on the inside of the folding base unit end frames XLOG 0HWKRG ...

Страница 22: ... R66 62 2 XLOG 0HWKRG Place the Cam lock frames 3 at either end within the trolley Ensure the diagonal struts of the Camlock frames fit between the arms of the assembly brackets ...

Страница 23: ...1m end frames in the centre of the trolley between the guardrail frames Add the final trapdoor deck in front of the 1m end frames Fit the 4 SP4 stabilisers in front of the trap door deck The trolley unit is now complete XLOG 0HWKRG ...

Страница 24: ......

Отзывы: