young time 212439 Скачать руководство пользователя страница 4

   Page 4 of 4 

 

 

6. Tip unit so Bottom with Floor Glides is up. Insert 8-

XAQB 

Cross Dowels into 10mm holes in the

Bottom and Top. Install 8-

XAQA 

Connector Bolts thru holes in the Sides and into Cross Dowels. Use

a screwdriver if needed to turn/align cross dowel threads for bolt.

7. Stand unit upright. Insert Cushion.

 

 

Отзывы: